LandSight is the solution of how fast, accurate and effective to review, evaluate and manage the project include but not limited to architecture and landscape
One drawing sheet can stand for 4 identical floors. The bill priced 1.
Mistakes like that hide in every construction drawing package, and someone has to find them by hand before a firm can quote. For a landscape package, that's about 2 weeks.
So I built Landsight.
You drop the developer's folder in as it came: CAD drawings, scans, Excel bills, backups. It gives every file a verdict, counts and measures what's drawn, and checks the bill against the drawings, the firm's price list and the building code. Then it drafts the change request and the reply to the developer.
Every number traces back to the drawing it came from, and nothing counts until a person confirms it.
We planted 30 errors in a sample package. It found 28, flagged 2 for a person and missed none. About 10 minutes instead of 2 weeks.
Under the hood:
- Muse Spark 1.3 reads what geometry can't settle and writes the prompts SAM 3.1 uses to measure colour plans.
- Muse Wonder learns each firm's habits.
- And because drawings are under NDA, there's a private mode on Muse Spark Open, Meta's open weights, with the same result.
Built for the Meta Global AI Developer Hackathon @AIatMeta@cerebral_valley
What's the worst drawing error you've seen?
#MetaAI #ConstructionTech #AI
"Saves what happened" is the part that makes an agent useful at a real firm.
Landsight's firm memory on Muse Wonder learns from what the estimator confirms and dismisses, sorts the next drawing package that way, and drafts the reply in the firm's voice. A person still hits send. π
Open weights matter most where the files can't go just anywhere. Construction drawings are one of those places.
We ran Meta's Muse Spark Open on a sample landscape package: 28 of 30 planted errors found, 2 handed to a person, 0 missed. Same result as the Meta Model API, on a server the firm chooses. π
"Keep them honest" is most of the job in construction, and it starts before anyone breaks ground: does the bill match the drawing?
On a sample package, the bill said 12 trees and the drawing had 8. One tree was drawn as 12 loose lines. Landsight catches that and asks a person to confirm. π
A developer sends the whole folder. π
30 files, all mixed up: CAD drawings, scans, Excel bills, backups.
Drop it all in. Landsight gives every file a verdict, reads and measures the drawings, checks the bill and the building code, and sorts what it finds: Send back, Fix before pricing, Building code.
Then it marks up the change request and drafts the reply. βοΈ
30 planted errors in a sample landscape package:
β 28 found Β· π 2 for a person Β· β 0 missed
Try it in your browser, no install π
#ConstructionTech #AI
Same 3 words to SAM 3.1, on two versions of the same planting plan: "light green area". π¨
Line drawing: 0 results.
Colour plan: 15.
Construction drawings are mostly lines. A model that reads colour has to be handed the right sheet.
That's the real work: knowing which file to ask, what to ask, and checking every answer against the drawing.
What's the "right input" problem in your field? π
Every firm answers a developer its own way. βοΈ
What to send back first. How to price. How to word the email.
A generic AI draft gets rewritten every time.
Landsight's firm memory runs on Muse Wonder. It learns your way from what your estimator confirms and dismisses. The next package comes back sorted your way, permit first, money after, with the reply drafted in your voice.
β Every finding in the draft
β No number made up
βοΈ You send it, not the AI
(Sample firm and package.)
How does your firm word a change request? π
#AI #ConstructionTech
Our AI found 28 of 30 planted errors.
The other 2, it wouldn't decide alone. π
1οΈβ£ A tree that might be protected. Removing it isn't a pricing call. It's the city's.
2οΈβ£ A bill row with a misspelt plant name. Probably camphor. "Probably" isn't good enough for a quote.
Both went to a person, with the drawing attached.
An AI that knows when to stop is worth more than one that's always sure.
Where should AI hand over to a person in your work? π
The bill says 12 trees. The drawing has 8. π³
Miss it before pricing, and you quote for 12.
Why does nobody catch it? One tree is drawn as 12 loose lines. Count the symbols, and you get 7.
Landsight sees those 12 lines are one tree, and asks you first. Once you confirm: 8 drawn, 4 billed too many. Flagged before anyone quotes. β
(Shown on a sample package.)
What's the biggest quantity gap you've caught? π
#ConstructionTech #AI
One drawing sheet can stand for 4 identical floors. The bill priced 1.
Mistakes like that hide in every construction drawing package, and someone has to find them by hand before a firm can quote. For a landscape package, that's about 2 weeks.
So I built Landsight.
You drop the developer's folder in as it came: CAD drawings, scans, Excel bills, backups. It gives every file a verdict, counts and measures what's drawn, and checks the bill against the drawings, the firm's price list and the building code. Then it drafts the change request and the reply to the developer.
Every number traces back to the drawing it came from, and nothing counts until a person confirms it.
We planted 30 errors in a sample package. It found 28, flagged 2 for a person and missed none. About 10 minutes instead of 2 weeks.
Under the hood:
- Muse Spark 1.3 reads what geometry can't settle and writes the prompts SAM 3.1 uses to measure colour plans.
- Muse Wonder learns each firm's habits.
- And because drawings are under NDA, there's a private mode on Muse Spark Open, Meta's open weights, with the same result.
Built for the Meta Global AI Developer Hackathon @AIatMeta@cerebral_valley
What's the worst drawing error you've seen?
#MetaAI #ConstructionTech #AI
1 sheet stands for 4 floors. The bill priced 1. π
That's one of the errors hiding in a landscape drawing package:
π± Roof soil 0.3 m, where 0.4 m is required.
π A planter sitting on the lift shaft.
πͺ An escape route squeezed to 0.9 m.
By hand, finding them takes about 2 weeks. Landsight: about 10 minutes. Every number traces back to the drawing, and nothing counts until a person confirms it.
(Shown on a sample package.)
What's the worst drawing error you've seen? π
#ConstructionTech #AI
One drawing sheet can stand for 4 identical floors. The bill priced 1.
Mistakes like that hide in every construction drawing package, and someone has to find them by hand before a firm can quote. For a landscape package, that's about 2 weeks.
So I built Landsight.
You drop the developer's folder in as it came: CAD drawings, scans, Excel bills, backups. It gives every file a verdict, counts and measures what's drawn, and checks the bill against the drawings, the firm's price list and the building code. Then it drafts the change request and the reply to the developer.
Every number traces back to the drawing it came from, and nothing counts until a person confirms it.
We planted 30 errors in a sample package. It found 28, flagged 2 for a person and missed none. About 10 minutes instead of 2 weeks.
Under the hood:
- Muse Spark 1.3 reads what geometry can't settle and writes the prompts SAM 3.1 uses to measure colour plans.
- Muse Wonder learns each firm's habits.
- And because drawings are under NDA, there's a private mode on Muse Spark Open, Meta's open weights, with the same result.
Built for the Meta Global AI Developer Hackathon @AIatMeta@cerebral_valley
What's the worst drawing error you've seen?
#MetaAI #ConstructionTech #AI
2 weeks β 10 minutes. On open weights. β±οΈ
That's checking a landscape drawing package by hand, then with Landsight.
30 planted errors in a sample package:
β 28 found
π 2 flagged for a person
β 0 missed
Same scoreboard on Muse Spark Open, @AIatMeta's open weights, on a server the firm chooses. Open weights aren't just for chatbots. π
Checking the drawings now takes minutes. Building is still the slow part.
How far are we from building on Mars? π
One drawing sheet can stand for 4 identical floors. The bill priced 1.
Mistakes like that hide in every construction drawing package, and someone has to find them by hand before a firm can quote. For a landscape package, that's about 2 weeks.
So I built Landsight.
You drop the developer's folder in as it came: CAD drawings, scans, Excel bills, backups. It gives every file a verdict, counts and measures what's drawn, and checks the bill against the drawings, the firm's price list and the building code. Then it drafts the change request and the reply to the developer.
Every number traces back to the drawing it came from, and nothing counts until a person confirms it.
We planted 30 errors in a sample package. It found 28, flagged 2 for a person and missed none. About 10 minutes instead of 2 weeks.
Under the hood:
- Muse Spark 1.3 reads what geometry can't settle and writes the prompts SAM 3.1 uses to measure colour plans.
- Muse Wonder learns each firm's habits.
- And because drawings are under NDA, there's a private mode on Muse Spark Open, Meta's open weights, with the same result.
Built for the Meta Global AI Developer Hackathon @AIatMeta@cerebral_valley
What's the worst drawing error you've seen?
#MetaAI #ConstructionTech #AI
@kimmonismus Memory pays off fastest in boring, high-stakes work. One landscape drawing package takes about 2 weeks to check by hand. With Meta's models in the loop: about 10 minutes, and every number traced back to the drawing. π
We put the Meta model family to work on construction drawings:
π§ Muse Spark reads every sheet
π― SAM 3.1 measures the colour plans
π Muse Spark Open runs our private mode
βοΈ Muse Wonder learns how each firm replies
30 planted errors in a sample package: 28 found, 2 for a person, 0 missed. π