$AEM Locked Earn is now live on @BiconomyCom.
- 30-day locked term
- Up to 31.63% APR
- Auto-redeem at maturity
- Min 800 AEM / Max 75,000 AEM per user
Opens 30 July, 00:00 UTC. The pool cap is limited — subscriptions close once it's filled.
Search "AEM" on Biconomy Earn to join.
📢 Update: SwarmBase $SWARM Airdrop 🪂
If you've completed 14+ days of check-ins and collected 5,000+ Score, you can claim the SwarmBase OG Badge, 500 Badge left only.
If you've completed 10+ days, check whether you're already eligible. I received my OG Badge with 11+ days of check-ins.
If you’ve no $opBNB, comment your evm address, I'll send you.
🔗 Join: https://t.co/8OD1AE0gx5
🔗 Full guide: https://t.co/6aZWkL1R9T
Some thoughts 👇
After I shared this(@SwarmBase) project, it gained a lot of attention.
It launched on opBNB, and within 3-4 days, it ranked #1 on BNB Chain across all categories🔥
They've allocated 20% of the total supply for the community:
– 10% unlocked at TGE
– 10% vested
Total supply: 1B $SWARM
If the project attracts strong VC backing, I'm expecting a 2-3 figure airdrop. Even without that, I still think it has 2-figure potential.
For a free airdrop, that's not bad in the current market
All you need to do is check in daily.
⚠️ Daily check-ins require a small amount of opBNB (around $0.01-$0.05 enough for life time).
If you don't have opbnb, comment your EVM address. I'll send some opBNB when I'm free 🫡
If you've already joined:
– What's your current Swarm Score?
– Did you collect all the badges?
Like, repost & share ❤️🩹
Moonclave EXP
X (Twitter)
ENDS IN 28D
Share the Moonclave Card on X
Claim the Moonclave Card on the site below and post on X tagging @themoonclave on x and using #moonclavecard hashta
📢 FREE $70-$100 per user + Potential Future Airdrop
Plus $300-$500 giveaway from me🔥
@themoonclave launched its Loyalty Program with a $10,000 $MCV reward pool.
You can also claim the Moonclave Card & Moonbound Discord role for potential future $MCV airdrop.
🔗 Join: https://t.co/g22oP5Br7U
– Connect your Phantom/Solana wallet
– Connect your X & Discord
– Claim points to unlock tasks
– If tasks don't appear, refresh the page
Then:
– Complete all free tasks & earn points
– Claim your Moonclave Card
– Post on X with #moonclavecard & claim points
– Claim the Moonbound Discord role #themoonclave
🏆 Reward Pool:
– Top 1-5 → $1,500-$450
– Top 6-25 → $350-$180
– Top 26-100 → $100-$70
Deadline: 1 Month
Even if you don't finish in the Top 100, you'll still have the Moonclave Card + Moonbound role, which could help with future $MCV airdrops🔥
If I finish in the Top 1 to 3, I'll share $300-$500 with people who joined through my referral link.
Only takes about a minute. Even if you don't want to grind, just join, claim the Moonclave Card + Discord role for future airdrop, and you're set 🫡
After claiming your Moonclave Card & Moonbound role, drop a screenshot below, I'll select the giveaway winners from the comments below 👇👇
Like, repost & share ❤️🩹
🔍 Check your EVM / On-chain Reputation
I just checked mine and claimed my On-chain Reputation Badges on @BigIntCo
What is BigInt?
BigInt is a Web3 on-chain reputation platform.
It builds your reputation based on:
– Multi-chain transaction history
– Trading activity
– NFT holdings
– Smart contract usage
– Ecosystem participation & more
Your on-chain history is no longer just a list of transactions. You can unlock Reputation Badges and build your digital identity across Base and other ecosystems.
🔗 Visit: https://t.co/HKWuM7vW11
You can also earn XP through quests and activities. XP helps you climb the leaderboard.
⚠️ Currently Claiming XP may require a high gas fee.NFA DYOR.
Like & share❤️🩹