@BxBoy12465@perry_lin1@rftylerpage 3.
While Texas data center sites are experiencing surging terminal value, signing 20-year extension outside of this exact AI lab commitment would have been highly unlikely. extension was strictly used as strategic bargaining chip to anchor a massive, multi-decade tenant structure
@BxBoy12465@perry_lin1@rftylerpage 2. Contract Design and Rent Recoupment
This contract mechanism was not uniquely "exclusive" to Terawulf, but Cipher chose to optimize for total enterprise terminal value and upfront dilution protection instead.
@BxBoy12465@perry_lin1@rftylerpage 1. Cost
Cipher's (\)CIFR) Barber Lake overruns reflect a fundamental, massive design pivot to accommodate dense AI computing clusters over a highly intensive 300MW total capacity layout.
@AlexisWrem1747@BlackPantherCap You’re worrying over very little trivial things in the grand scheme of things in. The things you e mentioned are already done repeatedly.
@perry_lin1 I’m still a newbie when it comes to analysis like this, what column should I pay attention to? My interest right now is with cipher. What’s your take on cifr’s situation. I like the fact that’s it’s fully funded. They should be ok in this environment? Thanks
@TheRealBirnbaum@TheCoinCollect8 Curious, what are your thoughts on what he was saying? Honestly, I think data center stocks like CIFR, Iris energy. Should both have great next few years ahead.