Y10 construction students were equipped with hard hats and hi-vis before being allowed to tour the new school while it is under construction. Many thanks to @bandkbuild for giving the students this unique opportunity.
The latest #Drone images of the #Steel Structure at the Digital Campus 4 development look fantastic! #GMIYorkshire will have delivered in excess of 240,000 sq ft of high-quality #Office#Accommodation at the Digital Campus, once the project is complete.
#loveconstruction
We are more than half way through the installation of our project at 4 New Bailey, Salford. Detail, supply and install of over 20,000m2 Metfloor 55 and 52,000 shear studs. All materials are manufactured in the U.K
Works are continuing at One Cambridge Square for Wates - with our detail, supply and install package of over 10,000m2 Metfloor 60 and 21,000No. shear studs.
Superb progress is being made with the steel frame, by Dave Madders and his team, at Whitworth Community High School. Fantastic collaboration between Wates, Williams Construction and Evadx Structural Steel. @WatesGroup@GavinDavisMCIOB@DavidSaville20 @bawden_jamie
Wonderful to see the Students so excited @WCHS_PE today with Dave Madders @WatesGroup to mark a key milestone in the build, the Steel Signing ceremony! Lots of inspirational quotes including one from student, Lucy she wrote ‘To new beginnings’🙌@MarkMcC_Wates@educationgovuk
We’re creating the new £8m RaisE Business Centre and innovation hub for @East_Riding, a new space designed to power SME businesses on the #Goole36 Enterprise Zone.
Procured through @YORbuild, the hub will leave a legacy of opportunity.
📽️ https://t.co/xBIBimenvM