@BalaamBarugahar@kakensaug@MirembeDr@JustineNameere Hon if u want to clean the ministry of health start with the office of the PS down words. Check well if every budgeted item reaches its final user, check with national medical stores and see if those drugs reach down to health facilities
@AlansMwesigwa Why is it called king George? Is it sponsored by the king or at least if they don't have anyone to honor in masindi ghey should name it after
Today, I inspected the ongoing construction works on the Masaka–Kyotera–Mutukula Road, a strategic regional corridor that connects Uganda to the United Republic of Tanzania and serves as a vital route for trade, tourism and cross-border movement.
I am concerned that with only two years remaining on the contract, just about 30% of the works have been completed. This pace is not satisfactory for a project of such national and regional importance.
I directed the contractor to intensify dust suppression by regularly watering the entire corridor, to prevent accidents which have become a common occurrence due to the dust and lack of speed humps.
The contractor has 90 days to commence tarmarcing of the road!
@MoWT_Uganda will maintain close supervision of this project to ensure improved performance, adherence to quality standards and timely delivery.
@OgwangOgwang@AlansMwesigwa Now you have a lead pick it from there. These things of being evidence write to me are the weapons of the corrupt. You are a minister with resources of govt ask igg or Cid to investigate
@MoWT_Uganda I wonder why katumba wamala is still a minister in govt himself he should be very ashamed of all the mess in ministry of works he led for ten years