@dariodangelo91 Mai lette cosรฌ tante scemenze insieme, fatta di opinioni personali, fanta geopolitica, notizie false e propaganda. Ma veramente credete alle stupidaggini che scrivete o lo fate solo per gli allocchi?
Google Flow โ Veo3 + Extend.
This scene builder thing is cool.
Veo3 with dialog + sound is a major plus.
PROCESS:
01. Gen 1st scene in Veo3
02. Select "Add to Scene"
03. Select extend
04. Add prompt + generate
VEO3 PROMPT:
A british rockstar with wild 80s-style hair and a studded leather jacket fumbles with a camera backstage at a rock concert, holding it in close like a snorricam rig. He looks directly into the camera, adjusting the focus, then smirks and says [Alright, is this thing on...letโs do it]. The image has a raw, handheld feelโhis face inches from the lens, eyes wide with anticipation. Around him, the dimly lit stage prep area buzzes with scattered instruments and cables. Just before stepping into the light. The lighting is natural and moody, with a faint blue cast from the stage lights behind him. Texture-rich details in his jacket and the background add realism and grit amongst the backstage hum of the people around him.
#google #promptshare