Giving away 5 GTD WL spots for @ArclingsNFT
6,283 fully on-chain 1-bit pixel collectibles, built on Arc Network.
SUPPLY: 6,283
PRICE: TBA
DATE: 16:09
To win:
✅ Follow: @ArclingsNFT@Emma_Telly_
✅ RT, tag a fren and drop EVM
GL
⏰12HRS
RARE FRIENDS NFT FREE MINT
11 September 📺
https://t.co/jXrqSOOAyT
WL FREE MINT — First 900 Wallet! :
Details:
Supply: 1,024
Chain : ROBINHOOD
Mint price : Free for WL!
Time: 1:30pm UTC
Follow+Like+retweet
Drop your EVM wallet below 👇
@HyperliquidX@RobinhoodApp@zecpunksnft@RareFriendsNFT
🎁 Acs x arclingsnft🎁
5x GTD Spots Giveaway
How to enter 👇
1️⃣ Follow @arclingsnft and @ACS_Dao & @ArunCryptoSpace
2️⃣ Like + Repost this giveaway tweet
⏰ Giveaway ends in 12 hours.
Good luck
Excited to announce my collaboration with @wuleNFTs 🤝
I’ll be giving away few GTD and FCFS spots right here on this post.
To enter 👇
✅ Follow @wuleNFTs , @Signal_DAO & @Quduslee914
✅ Like & Retweet
✅ Drop your EVM address
⏳ 6 hours. Good luck!
Been watching @ArclingsNFT for a while now 👀
The first fully on-chain identity collection on Arc (Circle’s L1), minting September 16.
• Supply: 6,283
• Network: ARC Mainnet
• Mint price: TBA
I managed to secure 5 GTD spots for my community.
If you’re following Arclings and want a shot at one, drop your wallet + a meaningful comment below 👇
→ Follow @hi_vecna & ♥️ Rt
→ Join TG: https://t.co/aHIZzzZSzr
I’ll share the details there.
ARC TERMINALS GIVEAWAY
@ArcTerminalss is bringing 5,555 FREE Terminals on @arc
5 GTD + 10 FCFS
→ Follow @ArcTerminalss+ @0X_SHORIF
→ Like & Repost
→ Tag 2 friends
→ Drop your EVM wallet
Deadline: 24 Hours
Good luck everyone
I'm giveaway 10 GTD spots of @xlords_tech
How To enter 👇
➠Follow @xlords_tech & @0xlyra_web3
➠Like + RT this post
➠Drop EVM address
Turn on both notification 🔔
Ends in 24 hours. Good luck all 🖤