Got my first dose @ApolloHosMumbai
It was a very smooth n streamlined process. No hassles and was done in about 25 mins.
Special thanks to the hospital staff for their services.
Everyone, do get your vaccine shot as soon as possible!
Travel is a nightmare because of these two bottlenecks and there is no solution in sight. It takes on an average 20-25 mins (40+ mins on bad days) to cover this stretch both Mumbai & Thane bound. Lacs of vehicles pass the stretch daily. (3/4)
Then you have the Thane railway overbridge which is yet to be widened - this was first proposed 13 years ago! Even if they start the widening work they have no alternate routes till the work gets completed which is estimated to be about 2 years!! (2/4)
Mulund EEH toll has been a mess always and it gets messier during monsoons.. You have potholes the size of craters both directions. Aren't a part of toll proceeds allocated for road maintenance??! (1/4)