Please Help near Sama - Harni Road , Vadodara
Society names are as below, blue ocean, temple view, madhuvan Clublife, siddheshwar hillarious, amardeep heights, dhyan residency etc
#help#Vadodara#RSS#vmc#pmo#cmogujarat#gujratrain
KPI Green.
Historic year as Revenue crossed 10Bโน for the first time.
FY 24 Revenue ๐ผ 59%
NP ๐ผ48%
With order book of 1.2GW and massive industry tail wind, growth rate can accelerate from here on.
#KPIGreen
@kpgroupgujarat
@FarukPatel3
Chandrayaan-3 Mission:
The Rover completed its assignments.
It is now safely parked and set into Sleep mode.
APXS and LIBS payloads are turned off.
Data from these payloads is transmitted to the Earth via the Lander.
Currently, the battery is fully charged.
The solar panel is oriented to receive the light at the next sunrise expected on September 22, 2023.
The receiver is kept on.
Hoping for a successful awakening for another set of assignments!
Else, it will forever stay there as India's lunar ambassador.
Chandrayaan-3 Mission:
'India๐ฎ๐ณ,
I reached my destination
and you too!'
: Chandrayaan-3
Chandrayaan-3 has successfully
soft-landed on the moon ๐!.
Congratulations, India๐ฎ๐ณ!
#Chandrayaan_3#Ch3
Chandrayaan-3 Mission:
The mission is on schedule.
Systems are undergoing regular checks.
Smooth sailing is continuing.
The Mission Operations Complex (MOX) is buzzed with energy & excitement!
The live telecast of the landing operations at MOX/ISTRAC begins at 17:20 Hrs. IST on August 23, 2023.
Here are the images of the moon captured by the Lander Position Detection Camera (LPDC) from an altitude of about 70 km, on August 19, 2023.
LPDC images assist the Lander Module in determining its position (latitude and longitude) by matching them against an onboard moon reference map.
Chandrayaan-3 Mission:
Todayโs successful firing, needed for a short duration, has put Chandrayaan-3 into an orbit of 153 km x 163 km, as intended.
With this, the lunar bound maneuvres are completed.
Itโs time for preparations as the Propulsion Module and the Lander Module gear up for their separate journeys.
Separation of the Lander Module from the Propulsion Module is planned for August 17, 2023.