ShopDispatch: AI & ops that help trade shops book more jobs.
Missed calls, weak follow-up, and half-built stacks cost more than another truck. Practical fixes for HVAC / plumbing / electrical / roofing owners.
Follow along. Reply CHECKLIST for the stack list when it drops.
@ContractingBiz Fewer truck rolls is the part I'd want to hear more on. If remote diagnostics can tell you before dispatch whether it's a reset or a part, the tech shows up with the right stuff and the customer gets a straight answer the first time. Curious how shops price that into agreements.
@noahiglerSEO Makes sense to me. If a slow day beats a bad ad call, I'd fill the gap from the shop's own list before buying more leads: past customers due for a tune-up, estimates nobody followed up on, the "call me back later" people. The office can work that list on a quiet morning.
5/ Keep a short no-slot list: name, number, the problem, earliest time that works. One named person owns it. "We'll call if something opens" with nobody checking is just a fake hold.
Save this for your Friday schedule review.
1/ "We're booked till Thursday" usually isn't a phone problem. Whoever answers can't create a slot that doesn't exist. The fix sits with whoever sets the schedule. Here's how I'd think about it.
4/ Check that online booking can't grab the held slot at night. Whatever the website can book, it should match what you'd book on the phone. After hours, keep on-call for the job types you've listed as emergencies.
@WSterlingSpace Agreed. A name and a cutoff does more than any feature. Even a whiteboard that says "called back by 5" works if one person checks it before they head out.
An after-hours script I'd hand whoever takes night calls:
1. "Service address and best callback number?" Read both back.
2. "What's it doing now? Leaking or unsafe?"
3. "After hours our fee is ___. It covers ___."
4. Book a real slot or give a callback time.
5. Read it all back.
@jamesonhaslam The ones you actually want always sting more. Did they tell you why? Price, timing, or someone else just got back to them first? Knowing which one makes the next bid easier.
@ContractingBiz Confidence matters, but I'd check the boring stuff before blaming the script: did anyone follow up the day after the quote, and did the homeowner get options in writing before the tech left? Feels like plenty of "bad close rate" is really quotes nobody touched again.
@BulkleyDesigns Fair point. Better to text the part of the list that actually needs it and let the replies clean up the rest than sit on it waiting for a perfect list.
When someone else has to say yes, help the caller reach them: get them on the line, hold a real slot, or send one summary they can forward.
https://t.co/MoNCE2nJn4
@daironprz@stevehunsaker1 That's simple enough that a crew would actually get it. Hard part is probably the job where the problem shows up a month later.
@thescarabosio@stevehunsaker1 Quarterly makes sense. Gives a callback time to actually show up before anyone gets paid on that job. Do you tie it to company GP or to each crew's own jobs?
@datamandoteth@Matt_Titan_ That split makes sense: people on the main line, something catching the overflow so it doesn't die in voicemail. Do you track how many after-hours calls get a callback by morning? That number usually shows whether the gap is worth fixing.