We have kicked off property-wide geophysics at our Castilla copper-gold project. The plan: turn surface signatures of up to 53.8 g/t Au and 17.7% Cu into ranked, drill-ready targets.
The Castilla project is 7,200 ha, 100%-owned, with no royalties and never drill-tested.
🔗https://t.co/IYl6XFN0P9 $CUPR.CN
Drill targeting is complete at our Cordillera copper project.
✅ 8 drill pads
✅ Up to 5,000m across 8–10 holes
✅ Targets sit at the intersection of surface Cu, magnetics, IP chargeability + 3D MVI
Last major geological gate before steel in the ground.
Read more: https://t.co/iE4lcWo2Nn
$CUPR.CN
Super Copper defines 3.5 km magnetic corridor at the Cordillera Cobre Project. 3D MVI geophysics identified a continuous magnetic corridor linking El Alto and Calcite Hill Targets for the first time.
Read more: https://t.co/iIHeJdxCLV $CUPR.CN $CUPPF
Our team is at the Cordillera Cobre Project this week, reviewing prospective platform locations as we advance toward our maiden drilling campaign.
$CUPR.CN $CUPPF
Featured on @CruxInvestor: CEO @dolesk discusses Super Copper’s strong capital position, the planned drill program at Cordillera, and the Company’s continued momentum.
Watch the interview here: https://t.co/xAN0RA4xYS $CUPR.CN $CUPPF $CUPR
Chile + US signing mining deals today. Financing, exploration, copper in focus.
Chile remains one of the world's most strategic copper jurisdictions.
https://t.co/dNGNXC8T7O
The #copper deficit is, in my view, one of the most underpriced macro stories of the decade.
Our portfolio company @SuperCopperCo has just defined a kilometre-scale copper target: 800m of strike, ~400m wide, ~400m deep - and open in all directions.
Historical scout drilling in 2007 only clipped the edges, returning already up to 1.6% copper. The core of the system has never been tested… until now.
Drilling is about to begin.
Phase 1 diamond drill program targeted for Q2 2026, designed to drive directly into the highest-chargeability zones for the first time in the project's history.
El Alto is drill-ready. Stay tuned. ⛏️🇨🇱
CSE: $CUPR.CN | OTCQB: $CUPPF
🔗 https://t.co/BjZqiY3uRm
NEW: We've defined a kilometre-scale copper anomaly corridor at our Cordillera Cobre Project, Chile.
5 consecutive IP lines. 800m+ strike. 400m+ vertical extent. Multiple high-chargeability cores, and the heart of the system has never seen a drill bit.
Here's what we found 🧵👇
This upgrades El Alto from a conceptual target to a defined, drill-ready copper-bearing system.
✅ Kilometre-scale target
✅ Confirmed copper mineralization
✅ Clean geophysical vector to untested core ✅ Structural controls extending >1km
We are pleased to announce the appointment of veteran mining executive Andrés Encina.
Mr. Encina’s operational track record includes the startup of six mining operations, commissioning of two 5,000 tpm processing plants, Sernageomin operational permitting, ENAMI registration and commercialization, and leading teams of up to 200 personnel.
Read more: https://t.co/P9FG9BOqOH $CUPR.CN $CUPPF $CUPR
What comes next:
→ IP Geophysics results
→ Final drill targeting
The focus from here is simple:
Drill it.
Read full news release here: https://t.co/6jRHPQ56ht
$CUPR $CUPR.CN $CUPPF
We are pleased to announce the completion of ground magnetics (geophysics) across 800+ hectares at Cordillera Cobre 🇨🇱
What we’re seeing:
→ A large, structurally controlled copper system starting to take shape
🧵👇
Trenching results:
• 17m @ 0.34% Cu
• Including 2m @ 1.48% Cu
• Multiple channel samples across zones
This is the first look at continuous mineralization across meaningful widths