A planted contractor writing straight to the database. Expedites flowing to one carrier. Perfect inventory certified destroyed. A new VP, an old investigator, an AI reading two years of logs in one night. My thriller The Silent Failure: https://t.co/MC5i25B11W
Write-off authorised. Destruction certified. Count reconciled. Four controls, four passes. So why is the container full? Episode 1 of The Silent Failure, my supply chain thriller: https://t.co/MC5i25B11W
Watched a site celebrate an 8 percent saving on a part, then air freight that part for a year. Freight hit logistics, inventory hit working capital, the saving stayed on the scorecard. Nobody ever netted it. My thriller The Silent Failure: https://t.co/MC5i25B11W
@typesfast, running Flexport in public with numbers nobody else shares. @Molson_Hart, what importing and manufacturing really cost. @FreightAlley, freight markets as they move.
A site showed 99 percent on time for eight straight quarters. During a shortage the business re-dated promises to latest availability to cut the noise. Reasonable. The shortage ended. The re-dating stayed. The metric measured the newest promise, never the first.
Ask when your site last reviewed the full parameter set instead of the twenty loudest materials. The answer is usually a year with a different CEO in it.