Lucky Draw Live on UniSat Drops
InSwap Trading Campaign S3 has ended with over $440k in buy-side trading volume. Thanks to everyone who participated!
The Lucky Draw Pools are live, and results will be announced later today. Participants can now check their eligible prize pools on the event page.
🎁 Total Lucky Draw rewards: 18,000 FB
⏰ Results announced: June 25, 08:00 UTC
⏳ Lucky Draw Drops & LP Support Reward claiming opens: June 26, 10:00 UTC
Eligible addresses are automatically entered into the corresponding prize pools - you don't need to do anything. The last 6 characters of the latest Bitcoin or Fractal block hash will be used as the random seed to determine winning addresses.
Links in the comment👇
1/2
Thank you for the kind words, and for keeping the discussion around decentralized, incentivized indexing alive for so long.
We do hope that an open, verifiable, and incentivized indexing model can eventually run on Bitcoin mainnet for BRC-20 and other Bitcoin-native assets.
There is still a lot to figure out, especially the right incentive design for Bitcoin mainnet. The work on Fractal has given us a strong foundation and a practical playground to keep iterating and make it battlefield-tested.
Also, thank you for your recognition of UniSat Wallet.
We know we still have a long way to go before becoming the best wallet on Bitcoin — especially for the UniSat App on mobile, where both functionalities and UX still need major improvements.
Over the next 6 months, we will try our best to learn from other great products and work really hard to narrow that gap. We believe passion and discipline are what will get us there.
Please keep watching us, giving feedback, and pushing us to do better. Thank you for being part of this journey 🙏
Notice: Gradual Discontinuation of CAT Protocol Support
CAT Protocol built a strong early community on Fractal, and UniSat supported it in full — across our wallet, explorer, marketplace, and indexer API, with continued improvements along the way.
Over time, however, we've seen limited ongoing development, code iteration, and governance activity around the protocol on Fractal. To keep optimizing our product experience and using our development resources effectively, we've made the difficult decision to gradually discontinue support for CAT Protocol.
📅 July 16
• CAT20 Marketplace support will be discontinued
• CAT20 Trading and listings will no longer be available
• CAT API support will be shutdown
📅 August 1
• CAT asset display, management, deposits, and withdrawals will be removed from UniSat Wallet
• CAT asset data and explorer support will be removed from UniScan
Please note:
• If you have any pending orders on UniSat marketplace, please cancel them before July 16.
• Users should transfer or withdraw CAT assets before August 1. After support is removed, CAT assets will remain on-chain on Fractal but will no longer be accessible through UniSat products.
UniSat remains committed to building stable, efficient infrastructure, and we'll continue focusing on improving our products and services.
Thank you for your support. 🙏
We've been heads-down building. Testnet is close.
While we finish, here's something real you can click: our own block explorer, indexing every transaction on the network.
https://t.co/NNrlLLdumU
Bitcoin-settled. No sidechain. Go look around.
$ORDI
🆕 Fractal Index Mining Data Now Available on UniScan
Track Fractal Index Mining activity directly on UniScan. View:
• Indexer rankings and staking activity
• Index Mining rewards and APR
• Total staked FB across indexers
• Quick access to staking FB or indexing node setup
• Miner rankings, hashrate charts, and network statistics
Link in the comment below 👇
1/2
Unisat dev @lorenzonical gives us a brief update on UniHexa Early Access trading
He mentions not only the technical challenges but also the liquidity challenges for support assets such as ORDI
The ORDI community will be watching closely for any product that supports and encourages ORDI denominated collateral and swap pairs and looks forward to testing this application
Kudos to @unisat_wallet for building through the tough times
UniScan Now Available at a New Domain
UniScan — UniSat's blockchain explorer for brc-20, Runes, Ordinals, and Alkanes — is now also accessible at our new official domain:
🔗 https://t.co/N3ZXod3kmR
This domain is maintained by the UniSat team and offers the same full suite of features as https://t.co/bUlpHtv00V, including asset search, transaction tracking, address lookup, and on-chain data.
Temporary Disruption to https://t.co/bUlpHtv00V
Some users may be experiencing issues accessing https://t.co/bUlpHtv00V due to false browser security warnings. Please be assured that UniScan and all UniSat services remain fully secure. Our team is actively working with the relevant providers to resolve this as quickly as possible.
In the meantime, we recommend using https://t.co/N3ZXod3kmR for uninterrupted access.
As always, please only visit official UniSat/UniScan links shared through our verified channels.
We apologize for any inconvenience. For support or questions, join us on Discord: https://t.co/ZsXziEIlZw
🆕 New UniSat Marketplace Trading Layout
Browse collections, track activity, and manage listings in one place.
✨ What's new:
• Side-panel Buy / Sell experience for brc-20/brc2.0/runes/alkanes matketplace
• Ticker data directly on collection pages
• K-charts and volume trends at a glance
• Activity and my Listings on the ticker details page
• Improved ladder pricing flow for batch listings
Link in the comments below 👇
🆕 Bulk Listing & Ladder Pricing on UniSat Marketplace
• Bulk listing for Collections, brc20, Runes, Alkanes, Names
• Ladder pricing support
• Batch price editing across multiple items
• Available both on Bitcoin & Fractal
Link in the comments below 👇
🆕 Smarter Batch Unlocking in UTXO Management Tool
Toggle on 'Skip protected UTXO warnings' so you can batch unlock protected UTXOs (UTXOs with inscription assets) — making large-scale UTXO cleanup and management much faster.
⚠️ Unlock with care
After enabling this option and unlocking assets, UTXOs with brc-20, Ordinals NFTs, or Runes assets will be treated as BTC after unlocking, you may burn valuable assets if mistakenly select the wrong UTXO.
✅ Before unlocking: Always review UTXO contents in the “UTXO List” under the All tab and only unlock UTXOs if you are fully certain the contained assets are unwanted
Links in the comments below 👇
1/2
Lucky Draw Bonus Now Live on UniSat Drops
InSwap Trading Campaign S2 has ended with over $435K in buy-side trading volume. Thanks to everyone who participated!
The Lucky Draw is live and results will be announced soon. You can check your eligible prize pools on event page.
🎁 Lucky Draw total rewards: 6,500 FB
⏰ Lucky Draw results announced: May 15, 08:00 UTC
⏳ Lucky Draw Drops rewards claiming opens: May 16, 10:00 UTC
You are automatically entered into draw pools that you're eligible for- you don't need to do anything. Winners will be selected automatically using an on-chain randomization mechanism. The last 6 characters of the latest Bitcoin or Fractal block hash are used as the random seed to fairly determine winning addresses.
Link in comments 👇
1/2
🎉 New FB Farming Pool Is Now Live
The ZeroBit Gate x FB Farming Pool is now live and open to all users. You may earn up to about 109.8% APY staking incentives by staking FB and stacking 7-day Gems under specific activity rules.
Pool details:
• Pool Cap: 2,000,000 FB
• Per address cap: 10,000 FB
🎁 Extra benefits for ZeroBit Gate Campaign Phase 1 eligible addresses
• 2 extra dedicated 7-Day Gem slots
• Activate up to 4 × 7-day Gems at the same time
Find link in comments👇