It's getting filled in stages, we've already stored more than 27TMC in 2025.
Hope Harish Rao also agrees to an interview & thrashes this fellow on this topic.
Brings this up time & again.
--
మల్లన్న సాగర్ 50 టీఎంసీలు ఎందుకు నింపలేదు.. https://t.co/87DlrJydVe
ఇసువంటి డొల్ల మాటలు ఆపి, పాలమూరు-రంగారెడ్డి లిఫ్ట్లోని ప్యాకేజీ-3 పనుల మీద ఫోకస్ పెట్టాలి.
నెలలోపల నార్లాపూర్ నుంచి ఏదుల దాకా నీళ్లు లిఫ్ట్ చేసి తమ చిత్తశుద్ధిని నిరూపించుకోవాలి.
what must be call them? badkows?
IRFC, a listed co, signed a legal agreement promising to disburse amount. Railway Minister stopped its disbursal
Now, claims ignorance
--
హైదరాబాద్ మెట్రోకు కేంద్రం షాక్.. ఐఆర్ఎఫ్సీ రుణం సంగతి తెలియదన్న అశ్వినీ వైష్ణవ్
https://t.co/sblZVHcvuZ
Delhi la kusunna badkow sannasulu, ide route lo pampina BHEL-Lakdikapul Metro Line ni footfalls levu ani enduku reject chesaro kuda cheppali!
aina tappu chesinde ankunna, ame sapota chesi leptunna party did more bad to us vis-a-vis delhi badkow sannasulu.
every day hour commute
GEMS OF KTR !
₹263 CRORE SPENT. BUT WHERE IS THE TRAFFIC RELIEF?
The Kothaguda–Kondapur multi-level flyover near AMB Mall was built under Telangana’s Strategic Road Development Programme (SRDP) at an estimated cost of ₹263.09 crore. It was inaugurated on January 1, 2023.
The project included:
• 2.216 km main flyover
• 5 lanes from SLN Terminus to Botanical Garden
• 6 lanes from Botanical Garden to Kothaguda
• 3 lanes from Kothaguda towards Kondapur
• 401 m Botanical Garden ramp
• 383 m HITEC City ramp
• 470 m, 3-lane underpass connecting Hafeezpet towards Gachibowli.
It was projected as a major solution to traffic congestion at Botanical Garden, Kothaguda and Kondapur junctions.
But what is the reality today?
Commuters continue to face massive traffic congestion. The flyover often appears underutilised while the road below remains choked with vehicles.
In October 2025, even media reports highlighted how road narrowing at the flyover’s exit creates a major bottleneck, with commuters reportedly spending over 30 minutes covering less than 2 km during peak hours.
A project of this scale and public expenditure should have been backed by comprehensive traffic-flow planning, not just construction of elevated roads.
Where did the planning go wrong?
Why does the ground-level road continue to choke?
Was the actual traffic movement studied before designing the entry and exit points?
Hyderabad needs solutions to traffic congestion, not expensive infrastructure that merely shifts the bottleneck from one junction to another.
BRS claims that they have built multiple flyovers , but the question isn’t how many kilometres of flyover were constructed or how much public money was spent. It’s whether commuters are reaching their destinations faster.
@navyogita lets see, if builders start opting for stp treated water - nothing like it, if they do and we can make it permanent
no other excuse would've worked to push them
@APAmaravati@sk__jalsa kondapochamma sagar was simpler to build, anduke first danini nimparu. mallanna sagar had a huge bund, there was no point waiting for its work to get finished.
@APAmaravati@sk__jalsa mee state gurinchi meeru chuskondi, D-wall sakkaga cheskondi. ledante malla kottuko pothadi.
distributaries ki utti PRLIS lo problem, kaleshwaram lo tenders largely done. maavi golsukattu chervulu, utti lakes nimpina large part of ayacut will get covered.
When a conglomerate enters a ₹30,000-Cr market with aggressive price cuts and the incumbent literally synonymous with bottled water in India faces a publicized prosecution order over a year old sample, market skepticism is predictable.
Look at this 8-day window in Sept 2025
👉Sept 22, 2025: GST on packaged water drops from 18% to 5%.
👉Sept 28, 2025: Reliance launches Campa Sure at ₹15/L, undercutting Bisleri’s ₹20.
👉Sept 30, 2025: Two days later, FSSAI lifts 6 samples from Bisleri’s Goa plant.
Notice the shifting goalposts in the lab trail:
👉5 samples pass; 1 breaches bromate marginally (12 vs 10 µg/L).
👉On appeal, the Referral Lab clears bromate, but flags PAHs instead.
👉Bisleri submits an independent lab clearance in Feb 2026; FSSAI goes silent for 9 months.
In Nov 2026, FSSAI publicizes prosecution in the media before serving Bisleri a formal notice.
Coming right after FSSAI scrapped mandatory BIS certification for water, easing co-packer onboarding for challengers, this looks less like public health and more like market disruption.
Expect Wildlife Clearance for Nakkalagandi-Dindi Balancing Reservoir for SLBC Tunnel Scheme!
Unless there are some gaps in application, all good!
-
Union Environment Minister chairs 92nd Meeting of the Standing Committee of the National Board for Wildlife
https://t.co/jiTZId1DHP
@Viswesmbnh 100MGD is deficit, only 40MGD of the planned is reliable given dedicated pipeline.
Rest 60MGD is up in the air. There will be shortages even for 3 day once supply. Even HMWSSB water tanker stations under singur/manjeera will not have water.