Anyone had an issue where @Solibri doesn't use all available RAM on your machine, then say there isn't enough RAM available?
I've loaded in 10 models and it's made no difference to RAM load but crashes?
'Yes we do BIM' - then proceeds to send a BEP of 19k words explaining ISO 19650 and a 'project information requirement' which contains nothing to do with the project or information??
Don't get me started on their EIR/AIR/PIS.
Why is it so hard?
Event: Digital Built Environment Conference 2024: Are we there yet?
📅 28/02/24
https://t.co/jtjDI5PNnT
Join us with @GliderBIM and our very own Alex and Emma for a day of keynote talks and interactive workshops to uncover the transformative essence of BIM and much more.
The construction industry needs to attract and retain new talent to drive innovation and sustainability.
From my own experience, I've written an article about the challenges young people face in this part of the industry.
https://t.co/rmwYAxNlQb
<<b>resultsummaryreport</b> />
This is a game changer in @Solibri Autorun- having the ability to now fully automate federating / checking / export straight into PowerBI.
We have a remote server which is fully undertaking validation on a task scheduler.
@for59j54 Thanks John - We have a tier one contractor with approx 100 subcontractors and another level of subcontractors. At what point do we configure the CDE?
My view is to be anyone producing ‘technical information’ to be exchanged into the CDE by the tier 1 contractor.
Question regarding CDE / Originator
With a Client CDE would you expect to configure the CDE to take Tier1 (ABC) supply chain information (DEF)?
Would all the information be be originated as (ABC) as that's the route of appointment? Or would the CDE need to take (DEF)/(GHI)?