Delhi-Vadodara Expressway: Dahod's Package 26 is the final missing link in Gujarat ЁЯЪЧЁЯЫгя╕П
ЁЯФ╣ The 30-km long Package 26 from the MP border to Bhimpura village in Dahod is delaying the full opening of the corridor.
ЁЯФ╣ Tough terrain like the Hathiyavan Mountain Cut and complex Limdi Interchange are causing engineering challenges.
ЁЯФ╣ Ground reports estimate it will take 6 to 7 more months to complete, missing the previously targeted May 2026 timeline.
Follow @gujarat_plus_