@Maha7Arindam Why ILFS is the only Double-Discharge station on the whole MML2B....??? They should have done the same for SG Barve Marg(Kurla) Station too.
@esmoteric@TheMahaIndex The AC coaches of the underslung medha ac locals have a 4-4-4 config, so just like in VB's is 4-4(8 cars) & 4-4-4-4(16 cars) so 16 and 20 will go like 4-4-4-4(16cars) & 4-4-4-4-4(20 cars), and the medha servodrivers(the noisy ones) have 3-3-3-3 config, next will be 3-3-3-3-3.
@ShrinivasP53821@akshaywcam1@grok Yes indeed there was "VOTE CHORI" done by BJP in 2024 Lok-Sabha Elec. & Every elec. after that in which they participated, grok is telling right.
@EvelNdMe@TyroneDsouza1 Yes indeed there is an entry at TKNG & LTT for TKNG statiom of MML2B like this. After getting out at the LTT side, a 2-minute walk needs to finish the commute to LTT.
@madrasmail@akshaywcam1@KonkanRailway@sureshpprabhu@RailMinIndia Reel ministers ko vande bharat chaicar, sleeper, aur amrit bharat se jab phursat milega tab kuch karega doubling ke liye, aur bhi kuch karega ki bhi nahi wo bhi nahi pata. Worst Rail Minister in India history.
@RaviMis25618672@SitamarhiJila ...1600kg rdx abhi bhi india me hai, unke operators nepal se ake ye 1600kg rdx se kahi phirse nahi 26/11 karde 2028 wala.
@Nai25344G@MUMBAIBESTAHEE Same is also at Mulund and Goregaon, foundation & roofs are done, GG maps imagery is 5-6 months old, so now it would be possibly completed, now only Chargers are remaining, that's it.
@Nai25344G@MUMBAIBESTAHEE Wadala, Malad, Goregaon, Mulund, everyone will be getting Blade Battery OL's, cause the PM e bus drive scheme busses hasn't even started production, so it most probably for OL's only.