@amy787 Amy. It would be interesting to make a complete evaluation. 250k cybertruck with 5500 dollar tax reduction on 4680 batteries is already 1.3B + high initial prices = free first stage of ramp ? BIG bonus: technology test (48V arch + wireless steering wheel) for next gen vehicle
@EmmetPeppers@SizeMichael Emmet, a simple advertising attempt in France for the start of Transat Jacques Vabre sailing race. Many people visited the stand.
@TheGeekGrouch@wholemars Yes, but the regulation in EU will include also level 4,5 case. If @wholemars is right on his timeline, both would be in phase! I am little less optimistic on the timeline for fully operational FSD in Europe though given some crazy roads in cities
@m_denniswinters@OppayahTwitR@CuriousPejjy@rocobasilisk@elonmusk It will indeed probably be much more than that the 1st month, but cost per vehicle will come down progressively. Timing is not bad because costs per vehicle for Model Y from Berlin and Austin are starting to be good and still improving.
@SF___Tahoe @SjvTesla Amy, everybody says 40GWh/year of megapack in China is huge, but when I look at the numbers needed in Master plan part 3, this seems tiny. What do I get wrong?
@herbertong@Tesla@elonmusk FSD extended to EU and other countries! That's very important for increasing take rate. Elon said last summer for EU, so it can be on your list!
@teslaeconomist What is the problem of some delays if you are an investor? A new factory is just being planned in Nevada with 4680. This is a great perspective. If you are a trader, then no need to learn about 4680 and so on because WS doesn't enter in these details. 1.8 M vehicles= sandbagging