$ZKAS - The only privacy coin I hold. Won’t catch me fading this one. ☝️
Kaspa based BlockDAG, advanced privacy tech, 1 second block targets and merge mining with Kaspa.
Still ranging around 800-900k MC. Very new and very early.
The upside from here is actually Stupid AF. You’ve been warned. Not financial advice always DYOR.
#ZKAS #Kaspa #PrivacyCoins #Crypto
Bitcoin had Miami.
Ethereum had DEVCON.
Now it’s Kaspa’s turn.
Introducing the Kaspa Conference: a 4-day experience bringing together builders, investors, and the $KAS community.
And we’re investing up to $1,000,000 in Kaspa startups.
Here’s what we’re building. 🧵
ZKas is a new Layer-1 cryptocurrency that combines:
• The speed and scalability of Kaspa's BlockDAG technology
• The privacy technology of Zcash (Orchard + Halo 2)
• Proof-of-Work security through kHeavyHash
• Merge mining compatibility with Kaspa
🎬 https://t.co/f9JYsIGBCJ is now live on YouTube!
Our first video—What Is ZKAS? Privacy by Default Explained—is premiering now.
Learn about privacy-by-default transactions, BlockDAG technology, and merged mining.
Watch and join the live chat:
https://t.co/OBSYt6aItl
#ZKAS #Privacy #BlockDAG
Fun fact @ViaBTC & @f2pool miners are missing potential ZKAS earnings during last 2 months.💰💰����🗑️
Ask@ your beloved pool to add ZKAS mode or switch to another pool if you want to earn more NOW.
Track in the real time how much your kHeavyHash ASICS can earn by mining both $KAS + $ZKAS
https://t.co/vFRopyEJxn
BitGo, the NYSE-listed custodian with $65.2B in assets on its platform in the quarter to June 30, has added Kaspa mainnet to its coin list and developer SDK. Its Kaspa module supports key generation and MPC signing.
@kaspaunchained
This is the best advertisement for ZK over XMR that ive seen. Holy crap could you imagine 11 years of XMR data becoming available... monero:native $ZKAS
@Kaspamoos@_cosmosman@michaelsuttonil@elperorr You are a sad human being. I feel bad for you given you spend most of your days spewing negative comments on X. Crypto investing isn’t for everyone, we get it you’re down a lot of money. Go touch some grass or be a productive member of SOMETHING (society, Kaspa community etc)
The all new https://t.co/UFZvawUIxO UI is LIVE.
Now, let's take $ZKAS to the masses. The Poloniex listing fundraiser is officially underway.
🎯 The Goal: Raise $20,000 USDT (or $15k USDT + $5k in ZKAS) $10,999 raised at the time of posting this tweet.
🔒 Secure & Auditable: EVM funds are held in a secure 2 of 3 multisig wallet, and you can audit the ZKAS wallet yourself using the public viewing key on the page.
💪 Let's Finish This ASAP: A tier 1 listing puts ZKas mandatory 1 second private transactions on the global radar. Every penny and community review brings us closer to the goal.
Let’s lock this in together, community! Drop your support here:
👉 https://t.co/dplgYpp4sT
#ZKas #Kaspa #Privacy #Poloniex #FairLaunch #nonkyc #kheavyhash #asic #pow
@michaelsuttonil@TruthEngine_KAS@Kaspamoos@elperorr Keep doing what you’re doing and you are very appreciated by the kaspa community! There will always be a small few that can’t regulate their emotions and probably should just avoid crypto entirely lol. Don’t let that small group of people bring you down.
A random fact: Optional privacy doesn't work.
Zcash lets you choose public or hidden. Most people choose public. Some Zcash users still call the whole thing “shielded money”. It is not. Only the people who bother to use the hidden option get privacy(and not always).
The rest of the chain is open like Bitcoin. Edward Snowden helped start Zcash. He said privacy should happen by itself, not as a choice you have to remember.
When privacy is optional the chain still has public doors. Money goes in public. May sit in the shielded pool. Comes out public.
The amounts and the timing on the public side can be matched even when the shielded pool itself is solid. This is pass-through linkage. Amount-matching. The pool hid the path inside. It did not hide the link between the public in and the public out.
Look at last week. Ledger/CryptoBilis theft. Over a hundred million gone. Funds moved through Tornado Cash into Zcash’s shielded pool and then out. @YFarmX matched 108 of 108 exits to their specific lots down to the zatoshi because the transparent amounts acted as a unique fingerprint. The hiding math worked in the middle. The public edges still leaked. The hacker was completely deanonymized.
When privacy is optional most activity stays transparent. The effective anonymity set shrinks. Users or services accidentally or intentionally leave trails via transparent pool addresses.
ZKas hides every payment. There is no public choice. The chain forces it. Mandatory shielded design removes the transparent boundary on the chain itself. There is no public “in” or “out” amount to match. Every transaction is private by default. The whole network contributes to the anonymity set. Users cannot opt out or shrink it.
ZKas inherited Kaspa’s BlockDAG. Many blocks can be made at the same time. That is why blocks come every second. The hiding math (Orchard, same strong math Zcash uses) was added on top of this fast system so it does not slow it down. Combined with modern zk proofs the goal is private money where the privacy is not a feature you turn on, but the default state of the chain.
Zcash is the biggest example of “optional privacy” system and it doesn’t work. Now imagine what’s happening inside even smaller anonymity set “optional privacy” systems.
Mandatory privacy > Optional privacy
Sorry $ZEC $DASH but $XMR and $ZKAS are 🐐🐐