South Mumbai's roads cannot afford another mega tender.
Have written to Municipal Commissioner Smt. Ashwini Bhide, urging the BMC to keep South Mumbai out of any mega tender for cement concrete road works, and to adopt zone-wise tendering instead.
These road works have remained incomplete since 2023, after two contractors under the mega tender model failed to deliver. With the BMC now preparing estimates of around ₹6,000 crore for new CC road works, placing South Mumbai in the same model again risks the same outcome.
The Island City has challenges the suburbs do not. Narrow roads and lanes, heavy traffic, frequent VIP and security restrictions, limited space for machinery and materials, and dense underground utility networks all call for smaller, carefully planned packages. Dividing the work by ward or zone means faster execution, clearer accountability, and immediate intervention the moment a contractor falls short.
South Mumbai deserves roads on par with the rest of the city, and the right tendering model is where that begins.
[zone wise tender south mumbai, cc road works mumbai, mega tender bmc, island city roads, ashwini bhide, cement concrete roads colaba, makarand narwekar, mumbai, bmc, colaba, corporator of colaba]
#PowerToPeople #MakarandNarwekar #CCRoads #Colaba #Mumbai
@narendramodi@AmitShah@NitinNabin@Dev_Fadnavis@mieknathshinde@SunetraA_Pawar@rahulnarwekar@RaviDadaChavan@AmeetSatam@TawdeRitu@mybmc@BJP4India@BJP4Maharashtra@BJP4Mumbai
IMPORTANT: PLEASE TAKE NOTE
BMC bans rockets, aerial firecrackers across Mumbai till November 25,2026 after spate of fires. Ban applies to public and private spaces, including terraces, balconies, parking lots and slum areas; order issued under Disaster Management Act. The prohibitory order, issued by additional municipal commissioner Prajakta Lavangare-Verma in her capacity as chairperson (in-charge) of the Urban Disaster Management Authority, Brihanmumbai, came into immediate effect on November 9 and will remain in force until 11.59 pm on November 25.
Marine Drive giving nothing to GenZ owners but this ignores enabling redevelopment guidelines issued by Govt! https://t.co/hd6TJFTthl @TheMumbaiMirror@DiwakarSharmaa
On 20th Nov 2017, Maharashtra’s Environment Department directed administrative departments to notify Silence Zones across the state.
We’re now documenting compliance in the identified Silence Zones in Mumbai, and we need your help.
If you hear loudspeakers or loud amplified music in a Silence Zone, share the location and tag @MumbaiPolice@mybmc@mpcb_official and @sumairaabdulali
Mumbai needs noise-free zones. Not noise-free promises.
📢 Update on BMC Commissioner's orders to keep Mumbai's footpaths encroachment-free:
A day after directing civic officials to clear encroachments from footpaths across Mumbai, BMC Commissioner @AshwiniBhide orders strict monitoring and accountability mechanism to ensure implementation of the drive.
Details below 👇
- Assistant Commissioners will conduct daily inspections of footpaths in their wards and review daily progress reports with before-and-after photographs.
- Deputy Commissioners will carry out weekly zonal reviews and submit reports to the Additional Municipal Commissioners.
- Additional Municipal Commissioners will review the progress every 15 days.
- Commissioner has warned that any negligence, delay or failure to implement the orders will not be tolerated.
- Responsibility will be fixed on the concerned officers, who will face strict disciplinary action for any lapse.
- Officials have also been directed to prepare a priority-wise list of footpaths to ensure systematic implementation and continuous monitoring.
A detailed engineering and design directions for footpaths is issued, including:
- Removal of non-standard or uneven ramps.
- Ensuring building entrances and doors open inward within property boundaries, not onto footpaths.
- Scientific pruning of tree branches obstructing pedestrian movement.
- Construction of new footpaths only as per the prescribed standard design using M40-grade concrete.
- No use of paver blocks or stamped concrete for new footpaths.
- Removal of gaps, uneven levels and other physical obstacles to make footpaths safe and accessible for pedestrians.
June 11 marks the official onset date of the monsoon over Mumbai, but the city is still waiting. Hot and humid conditions continue to dominate, with the monsoon yet to make its much-awaited arrival.
Weather remains as unpredictable as ever. Last year, the monsoon reached Mumbai on May 26, 2025 well ahead of schedule. This year, however, the official onset date has come without rain.
For a city whose water security and daily life depend heavily on the monsoon, timely rainfall is crucial. Current weather models suggest rain activity could pick up after June 20, but for now, it’s wait & watch.
बृहन्मुंबई महानगरपालिकेने मुंबई महानगरातील पायाभूत सुविधांचा दर्जा उंचावण्यासाठी व्यापक स्वरुपात नियोजन केले आहे. नागरिकांना खड्डेमुक्त रस्ते उपलब्ध व्हावेत यासाठी रस्त्यांचे सिमेंट काँक्रिटीकरण प्रकल्प दोन टप्प्यांमध्ये हाती घेतला आहे. काँक्रिटीकरणाची कामे विहित वेळेत आणि गुणवत्तापूर्ण पद्धतीने करण्यात यावीत, असे निर्देश बृहन्मुंबई महानगरपालिका आयुक्त श्रीमती अश्विनी भिडे यांनी दिले आहे.
रस्ते सिमेंट काँक्रिटीकरण प्रकल्पात गुणवत्तेसह पारदर्शकता आणण्यासाठी बृहन्मुंबई महानगरपालिकेने ‘डॅश बोर्ड’ सर्वांसाठी खुला आहे. हा डॅशबोर्ड https://t.co/ChnhEoQO1D या लिंकवर उपलब्ध आहे. रस्ते सिमेंट काँक्रिटीकराची सद्यस्थिती याद्वारे नागरिकांना समजणार आहे. त्यामुळे रस्ते गुणवत्तेबाबत अधिक दक्ष राहणे गरजेचे आहे. सध्या सुरू असलेल्या रस्त्यांची कामे दिनांक ३१ मे २०२६ पर्यंत पूर्ण होतील, याची दक्षता घेण्याचे निर्देश श्रीमती भिडे यांनी दिले आहेत.
🔹महानगरपालिका आयुक्त श्रीमती भिडे रस्ते काँक्रिटीकरण प्रकल्पाची आढावा बैठक घेतली. यावेळी अतिरिक्त महानगरपालिका आयुक्त (प्रकल्प) श्री. अभिजीत बांगर, उप आयुक्त (पायाभूत सुविधा) श्री. गिरीश निकम, उप आयुक्त (आयुक्त कार्यालय) श्री. प्रशांत गायकवाड, प्रमुख अभियंता (रस्ते) श्री. मंतय्या स्वामी आदींसह अभियंते उपस्थित होते.
🔹रस्ते सिमेंट काँक्रिटीकरण प्रकल्पाच्या टप्पा १ आणि टप्पा २ अंतर्गत २,११८ रस्त्यांचे (लांबी ६९१.०८ किलोमीटर) सिमेंट काँक्रिटीकरण करण्यात येत आहे. या अंतर्गत ७१ टक्के रस्त्यांचे काँक्रिटीकरण पूर्ण झाले आहे. सिमेंट काँक्रिटीकरण पूर्ण झालेले, प्रगतिपथावर असलेले आणि लवकरच काँक्रिटीकरण सुरू होणाऱ्या रस्त्यांची माहिती ‘डॅश बोर्ड’वर स्वतंत्र रकान्यात देण्यात आली आहे. नागरिकांनी या लिंकच्या सहाय्याने आपल्या जवळच्या रस्ते काँक्रिटीकरण प्रकल्पाबाबत माहिती घ्यावी, असे आवाहन बृहन्मुंबई महानगरपालिकेने केले आहे.
🔗डॅश बोर्डची लिंक : https://t.co/ChnhEoQO1D
#mybmcupdates
@CMOMaharashtra@mieknathshinde@SunetraA_Pawar@ShelarAshish@MPLodha@TawdeRitu@misanjayghadi
Congratulations to the 227 corporators who’ve made it to the BMC, 2026. Looking forward to hearing strong voices on real civic issues in the house, the standing committee and beyond. Less appeasement, more governance, please.
Ward number 225
Harshita Narvekar of BJP - 11307 votes
Sujata Sanap of shiv Sena - 5702 votes
Ajinkya Ashok Dhatrak of Shiv Sena (UBT) - 6423 votes
Nota - 422 votes