Look at the condition of newly constructed concrete service road on Pune-Banglore highway, near Punawale, within 2-3 months. Corruption at its peak. #spacetechnology
@RockWithboAt@amangupta0303
Where would I add the address 2 in this form? It keeps on asking me to add the address 2, but there is no such a field. Its really annoying. I have been trying multiple times. But no use.
PMC, PCMC मधील नगरसेवकांची reel बाजी भयंकर वाढली आहे.साधा एखादा खड्डा बुजवला/एखाद झाड तोडल/चेंबर च झाकण दुरुस्त केला/कुठे visit केली की भली मोठी पोस्ट वा reel आली च. कितीतरी गंभीर प्रश्न आहेत जसे की Punawale+Tathawade Underpass त्यावर लवकरात लवकर उपाय काढणे गरजेचे आहे.
@PCcityPolice How are these locals allowed to burn firecrackers at around 1:30 midnight? This is not the first time it's happening, and this is not gonna stop soon unless you take strict action. Location: Punawale
@volklub Sir, wht should be the bottom rate for selling 3 y old (2023 make), single owner Brezza zxi AT 29.5k KM running? Top condition, no major repairs.
Rubbing tobacco is important.
This idiot was driving in the middle n when I honked d horn of my car, he asked me to wait as he was doing something very important. Vehicle Number : KA32HH1233 location: Chapekar Chowk Flyover @PCcityPolice plz take strict action.
How a pedestrian is supposed to walk? Sewage water overflowing on the road, huge traffic, rash drivers, two wheelers driven on the footpath and on top this 4 wheeler parked in the middle of the footpath. MH40KR5636 @PCcityPolice Location: Geras Imperium Oasis Pimpri
I think the road construction in front of Adhira School is going to start only after the slab construction of commercial project (which is owned by local BJP politician) gets completed.
Seems neither contractor nor PCMC is in mood to complete the Punawale DP road construction before monsoon.We r really done with the daily dust pollution.We deserve cleaner roads with footpath.Plz stop doing work in small patches. No road work infront of Adhira School since months
Seems neither contractor nor PCMC is in mood to complete the Punawale DP road construction before monsoon.We r really done with the daily dust pollution.We deserve cleaner roads with footpath.Plz stop doing work in small patches. No road work infront of Adhira School since months
@Rahul_Kalate साहेब, कृपया या ��्रश्नावर त्वरित तोडगा काढावा. गेल्या काही वर्षांतील पावसाळ्यात येथील परिस्थिती भयावह होती. कृपया या वर्षी तरी नागरिकांची या त्रासातून मुक्तता करावी.
@Rahul_Kalate सर, Punawale येथील कोयते वस्ती ते ताजणे वस्ती रस्त्याचे काम बर्याच आठवड्यांपासून जैसे थे आहे. Adhira School समोर रोज सकाळी व दुपारी ट्रॅफिक समस्या, तसेच रस्त्यांच्या सुमार अवस्थेमुळे अपघातांचे प्रमा�� देखील वाढले आहे. Kindly do the needful at earliest.
This strech of Punawale (Koyate wasti-Tajane Wasti) is being completed in patches, with no progress since last few weeks.I don't understand why the road in front of Adhira School is not being constructed. Please expedite.Cant imagine the situation in coming rainy season.
@pcmcindiagovin@PCMCSarathi@Rahul_Kalate@iShankarJagtap Construction of all the DP roads in Punawale is moving at a snail's pace. At this rate, I don't see them finishing before the rainy season and we've had a terrible time during the last few. Please help to speed things up!
Footpath for walking ❌️
Parking Adda ✅️
Location: Kate Central, Kate Puram Chowk, Pimple Gurav
@PCcityPolice@PuneCityTraffic
Could you please take necessary action and share Challan details?
I think residents from Nexus Westpride, Skylish Avenue, LEGACY Liva, NOVOPRIDE housing societies in Tajane Wasti, Punawale should togetherly abstain from voting in upcoming municipal election. No proper road to these Societies since last 4 years. No Road, No Vote.