The Credit Suisse Building Structure's despite being less than 25 years old, would be demolished to increase GLA from 2.1 lakh Sq. Ft. 6 floor to 10 lakh Sq. Ft. 18 floors. Architect: Hafeez Contractor. Demolition: October 2023. Completion: 2026. Total Investment: 800 crore plus.
@iamsahaj_xyz I use Figma for sketching ideas but the delivery work for use by SWEs is mostly code now.
Being 100% code can constrain your imagination, ground it too much in immediate feasibility.
@soleio@jennywen The year is 2027. Design systems is the only "design" team staffed internally. User flows, research, UI done by PMs with design agents that run through a principal designer's yes/no vote. Devs revise at the speed of feedback, route through a PM yay/nay pipe. Senior ICs can veto
@prakdadlani@VishakhRanotra The "italian" machines are beautiful but the ripoff index is too much.
A slightly cheaper <$1k Indian take on the Rocket Appartamento would kill it even with tariffs etc.
Absolute lifesaver, even if it may be an interaction design change under the hood, it makes the experience better than interrupting Claude's chain of thought and restating + your /btw context.