@Truthful_ast The pilot triggers An unscheduled command module seperation and now the rest of the crew has to consume RCS and Delta v to course correct while the pilot tries to open the backup version of outlook
@shortmsger@davill@AST_SpaceMobile 1) Engines already installed
2) Transporter Erector it'll take it to the launch pad right outside the doors and tilt it upward for launch.
3) It will launch in april. Keep an eye out for next week.
Another look. We've integrated @AST_SpaceMobile's Block 2 BlueBird satellite into our third New Glenn fairing. For the first time, encapsulation took place in our Lunar Plant 1 high bay. The payload will now move to the integration facility at LC-36, transported by a specially built transporter that can crab laterally and spin 360° around its center without translation in any direction.
@sbarky38 Funny that's how calibration and precision is reached. If you can't nail it the first time as a screw and turn it a quarter of the way then try again
@_ALibertyWizard@MrRightMrow@NASAAmes@SpaceX That is not at all what the Challenger disaster was. Yes it was bad called and the conditions for launch were horrible, but it wasn't a material issue.
@ScottLikedSLS @JJ21338337 Refurb will always be at LC-36, there is no real difference between the two except the travel distance and traffic. As in we are the traffic lol
Finally I can open my mouth! BE-4 is getting a 15% increase in total thrust, BE-3U is getting a 25% increase in thrust and with New Glenn 9E we have 9 BE-4s and 4 BE-3Us for over 70 Tons to LEO
@ralphellis87311 @JohnHanzl@MarcusHouse I'm sorry but what are you talking about? I've worked on these things and the triple redundancies on these systems are why it passes certification. Every airplane's hydraulics goes through the wheel bay cause it's easy to service and maintain.