A reference picture can start the conversation. It doesn’t finish the scope. Which detail would you clarify first? Follow for practical ways to handle the business side of the trades.
Price change on day two is how you lose a client. If the outlets are going to be tricky, that goes in the estimate or a signed change order before you start. Not after.
@TheFortressInc Engineered hardwood in Granby is a climate call. Keep the HVAC on site running through install so the boards do not cup once the heat comes on.
@CreteExpert 4000 PSI is the easy part. With mesh already down, watch the pour date against the weather. A hot afternoon and a late float is how those decks crack the next morning.
@forman51961 Every 4 feet at closeout is a $3.4M lesson. Next punch, put the can layout on the drawings and have the GC price the difference before they start hanging them.
@ChadMPeterman Paying them the whole 20 weeks is the part most shops skip. After the class do you pair each one with a lead tech or keep them together as a group?
@RoofIndy We put the stop line in writing. Dry out and demo only, drywall, paint and flooring priced separately. Saves a lot of surprise when the fans come out.
@GrulkeLamonte Fourteen months for 1% is a tough lesson. Still better than capital that never closes. Keep swinging and you learn which jobs to walk from.
@forman51961 Punch list can't fix a lighting plan that never existed. Layers belong on the print, not as an afterthought when the client walks the room.