@RMTunion There has always been give and take in negotiations. Deals over the years have worked for both sides. Your members will lose money coming up to Christmas. Get back around the table.
@E7Drew@CLondoner92 They are package deals through a tour operator. It's in the holiday cost in the same way as theatre tickets and open top bus trips are included. Coach tour operators do packages in this country. If there was significant UK demand somebody would do it.
@E7Drew@CLondoner92 Overseas visitor Oyster cards (and previously London Explorer & Travelcards) have always been sold at a discount in package deals. Tourists arrive with a voucher to exchange. Many years ago actual Go-As-You-Please tickets were sold by Britrail Travel in the USA.
@s_walthamstow@roozie52@NFBUK@VincentStops You have obviously never seen problems with 2 way cycle lanes where a mother struggles to keep a tiny child off the lane only for a speeding cyclist approaching from behind to miss the tot by inches.
@TheMurkyDepths@MrOkereke@tomcopley@mtpennycook The main site is next to Network Rail property and track plus the obvious weight constraints of building above the DLR tracks. Significant cost implications. Possible 2029 start.
@SteveWhiteRail The trouble is all routes from Woolwich/Greenwich lead to Bank/Cannon Street. Changing trains at London Bridge takes longer than it did in 1972 and involves going through a retail park. Fortunately the trains from Woolwich Arsenal via Lewisham enable a change to a CX train there.
@GeoffreyBoycott First saw him playing for Kent against Surrey at the Rectory Field Blackheath. Two years running he skittled out Surrey on the last day. Pitch inspector condemned the wicket. Ground never saw another first class game.
@HarleysTravels@G_plus_C but would they last any better than the existing trains? Warm storage isn't the issue and will no doubt cease when the others are withdrawn.
@GregHammond66 please get real. Old lines will not ever go without someone in the cab. The trains are all automated except the Bakerloo line. Invest in new tunnels and you might.