Does anyone else find it annoying that Twitter won't accept photos unless they are reduced in size? Waste of time, follow Hadarford's blog instead https://t.co/Tvilv05YLE
17 days ago I made a slow start on this 3D printed model of a narrow gauge version of a Sentinel steam engine. It just needs transfers to complete. See captions for details π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
Whilst I had the box with all my static grass gear open, I used my precision micro applicator to hide the crack that appeared in the towpath walling when the resin in the canal cracked 2 years ago. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
With the glue having had time to set, the tree I added foliage to earlier this morning, is now back in it's place. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
Having used my box static grass applicator yesterday to re-leaf some trees, this morning, before packing it away, I gave this tree some new leafage, as it was looking very sorry for itself. Now looking much better π³ #modelrailway#narrowgauge https://t.co/Tvilv05YLE
Being a rainy day today, I set about adding new leafs to these trees to improve their look using my WWS Pro Grass Box Static Grass Applicator. This was the last group of 3 batches I treated today.π³π³π³#modelrailway#narrowgauge https://t.co/Tvilv05YLE
Railway staff fitted inside the quarryman's coaches, their leg amputations went well. The now completed coaches in service behind 0-4-0 quarry Hunslet 'Nesta' passing Hadarford wood. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
3 sets of Greenwich couplings assembled, then glued to the underside of the 3 quarryman's coaches. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
0-4-0's 'Chloe' & 'Leo' posing the 3 new quarryman's coaches (with the original whitemetal one at the rear of the train) alongside Hadarford lock, freshly painted and glazed this morning, but awaiting couplings to complete. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
This afternoon I assembled these 3 Dundas Models quarryman's coaches, ready for painting. π Now with a coat of primer, and on the roofs. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
Today I completed the initial construction of the fiddleyard end of the large lift-out bridge by adding the section of the bridge, which I cut off, to the fiddleyard baseboard, and constructed the new retaining sections. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE
0-4-4-0 double Fairlie 'Earl of Merioneth' with a train of bugboxes passing through the PW depot below the castle ruins. π #modelrailway#narrowgauge https://t.co/Tvilv05YLE