Starting with just $500, you can build a small veggie project that gives you a clean $600+ return every month.
Not magic. Not luck. Just consistency, planning, and understanding how fast vegetables move in the market.
Here’s the controversial truth
Thread 🧵
Guys, the Human Rights Commission made a public claim that hospitals are not overcrowded due to illegal foreigners. As ActionSA in Gauteng, we challenged them to share the data and methodology they used to reach that conclusion.
They have now replied, and their statement is based on records from just 4 to 5 hospitals which were themselves read incorrectly. They also back their claim with a 2015 UCT Law thesis and a few academic studies, most of which rely on surveys rather than actual hospital admission data.
On the 30th of 2026, no one will be harmed. The meeting is long overdue for all South Africans to raise their concerns since the 1976 Soweto Uprising about many issues that need to be addressed.
1. Looting
2. Nepotism
3. Illegal foreigners
4. Inflation
5. Unemployment
6. Human Trafficking
7. Feeding South Africans rotten and poisonous food
8. Fake Churches
9. SAPS: fraudulent police & drugs
10. Deportations delayed
11. Madlanga Commission continuation
#Abahambe
#themadlangacommission
🚧UNDER CONSTRUCTION: The R3.2 billion private Afrikaans university in Pretoria East is currently being built on a 220-hectare site, and progress is powering on
They broke ground in January this year, and the first batch of students is expected to be welcomed in January 2028.
The campus includes: learning centres, a library, offices, an amphitheatre, coffee shops, a cafeteria, a student centre, lecture rooms and laboratories. There will also be a student residence housing 750 students.
These facilities will be used by 400 staff members and 2500 students daily.
This is a huge project; during ground earthworks in 2025, they removed 360,000 m3 of soil from the site. The campus infrastructure also includes:
• 40km fibre cables
• 23km of underground water pipes
• 19.3 million litres of water storage
• 30 000m2 tar for roads and parking
See the latest pics of the construction site below.