Imagine if the Hon. Education Minister, #DharmendraPradhan, were an #IT#ProjectManager, and multiple project go-lives under his leadership failed, were delayed, or resulted in major outages. What would an IT company typically do?
1)Continue him in the same role?
2)Put him on a #Performance Improvement Plan (#PIP)?
3)Terminate his employment?
4)Give him a poor performance rating and push for a forced resignation?
This is just a hypothetical comparison. In the IT industry, employees can lose their jobs over performance issues or failed project deliveries. Yet in public life, accountability often works differently, even when there are major controversies or administrative failures.
Should standards of accountability be more consistent across leadership roles?
🌧️ Only during heavy rains do we remember that a city receiving huge rainfall needs a proper storm-water drainage system.
⚡ Only during power outages do we realize that thousands of new buildings have put enormous load on weak infrastructure.
🚗 Only after endless traffic jams do we realize our roads and underpasses are too small.
❓How did our city planners, authorities & leaders approve so many new projects without ensuring adequate storm-water drains, roads, power capacity, water supply, garbage management and traffic planning?
🙏 If infrastructure is not ready, don’t approve new projects.
💰 Stop corruption. Stop taking bribes for project approvals. People’s lives are being affected because of poor planning and unchecked approvals.
Citizens are suffering every single monsoon. Enough is enough.
#PuneRains #Pune #PCMC #PMRDA #MIDC #Hinjawadi #Wakad #Baner #Balewadi #Ravet #Infrastructure #UrbanPlanning #PowerOutage #Traffic #Flooding #StopCorruption #Accountability #ForumForITEmployees
@CMOMaharashtra
🚧 Accelerated Road Development in Hinjawadi IT Park! 🚧
To upgrade the traffic infrastructure in the Hinjawadi IT Park & MIDC area of Mulshi Taluka, PMRDA has undertaken the development of three key roads. These roads will boost the operational efficiency of the IT & Industrial zone and provide citizens with safer and smoother travel.
Project scope:
✅ 1.50 km long and 36-meter wide road between Mahalunge and Hinjawadi Phase 1 is being developed at a cost of ₹13.05 crore.
✅ The Thakar Vasti to Man Gaothan road (2.40 km) is underway with a budget of ₹20.88 crore.
✅ The Surya Hospital to Thakar Vasti road (3.50 km) has received approval for development works worth ₹30.45 crore.
Land acquisition processes have already begun. Once completed, these roads will make IT, Industrial and urban life more convenient, safe, and efficient for all.
@Dev_Fadnavis@CMOMaharashtra@RaviDadaChavan@BJP4Maharashtra@OfficialPMRDA
#PMRDA #Hinjawadi #Man #Mhalunge #HinjawadiITPark #RoadDevelopment #UrbanInfrastructure #Mulshi #UnclogHinjawadiITPark
INDIAN EXPRESS DROPS A LAND BOMB ON BJP CM 🔥
After Mohan Yadav became Madhya Pradesh CM, his family and real estate companies reportedly bought at least 137 plots spread over 168 acres in and around Ujjain.
This is the same Ujjain being reshaped for Simhastha 2028 with highways, road widening, townships, riverfront projects, medical city, IT park and new commercial zones.
The most damning part is this: out of the 168 acres bought after he became CM, 111 acres are reportedly located along roads announced by CM Mohan Yadav himself.
His family already had land. But after Dec 2023, the land buying saw a sharp jump, right when Ujjain’s development map started turning into a goldmine.
Indian Express repeatedly asked the CM for answers. He stayed silent.
This is how BJP turns religion into a business model 😡
Activist Vinita Deshmukh Slams Naming of Baner Cancer Hospital After BJP Corporator's Father, Urges CM Fadnavis to Intervene
@Dev_Fadnavis@PMCPune@navalMH@VinitaDeshmukh
Read in detail here : https://t.co/m9BaH1D8MV
@punekarnews Only Builder's are emerging. @PMCPune helps them to emerge but they forgot abt thr primary job like providing roads and water to the new areas. Last 6 years officers from PMC literally looted #Pune@OfficialPMRDA Escaped frm this vry swiftly looting land of farmers fr 8 yrs now.