The second 3000+ km/s far side full-halo CME of Solar Cycle 25 (!!) - March 13th, 2023. Just for comparison, the 29 October 2003 full-halo CME, launched by an X24.6+ flare, that caused the first of the two 2003 Halloween G5 storms was significantly slower at ~2450 km/s.
Concrete can get fractures that can compromise it’s integrity, it doesn’t need to be cratered for it to be bad. You cannot see it from a drone shot
You yourself were talking about concrete and support tower rebuild after the pictures were released.
I am well aware of what amazon does in various parts of it’s businesses and none of them is that helpful in accelerating timelines. Steel beams and concrete is manufactured in abundance, blue origin won’t use even more than 0.1% of the daily supply and these are all basically commodity, they can pay some amount more and it’ll be available faster than they can use them
That is not what the 18 month timelines were based on. The assumptions were
- the concrete was damage and major work would need to be done
- the big support tower would need to be demolished and rebuilt
If the damage isn’t that bad timelines shrink significantly. You misunderstand why it the timeline is shorter now and was long before, it is not “supply chain orchestration”, it’s an engineering and construction problem and they need to rebuild less