White House says Iran "very much continues" talks with Washington, wants to "make a deal" despite US strikes
Read @ANI Story | https://t.co/fvJjnlffdU
#WhiteHouse#Iran#USstrikes
With reference to reports circulating in the media regarding the Kudankulam Nuclear Power Project (KKNPP) Units 3 & 4, it is clarified that the Engineering, Procurement and Construction (EPC) contract for the Common Services – Balance of Plant (BoP) package was awarded to Reliance Infrastructure Ltd. in 2018 through a Public Tender process. The scope of the contract includes Engineering, Procurement/Supply, Construction and Commissioning of Common service facilities. These facilities are of conventional nature and are typically found in thermal power plants as well as other process industries. They are not related to nuclear safety or nuclear security systems. NPCIL reiterates that the information claimed to be available in the public domain pertains only to conventional Balance of Plant (BoP) common service facilities and does not relate to any nuclear safety - or nuclear security-related systems or information: NPCIL
99% of options traders are gambling because they never learned the fundamentals.
This 1-hour Yale lecture changes everything.
In just 60 minutes, you’ll learn more about options trading than most overpriced trading courses ever teach.
No hype. No fake gurus. Just real knowledge.
Save this and watch it without distractions. 📌
Honored to have been invited to speak at @APCSS on strengthening operational burden-sharing across the region. The United States is working with Indian Ocean nations to build critical port infrastructure with trusted vendors - ensuring vital maritime networks remain secure, resilient, and free from strategic dependency.