@jrhartman131 Add 3 sensors: pressure, current and flow for under $1000.
see failures coming from 6 months out.
every failure mode shows up in 1 or more of the readings
Bonus: it'll monitors leaks - 1/2 in dia hole costs $80K per year in electrical bill.
@antonia_mdprjct An underrated aspect when hiring project managers, GC's or anyone influencing supplier or sub contractor selection
- The network of QC'd providers they bring. "I know a guy"
@AlexForbesOps Classify contractors into:
a) high quality low productivity
b) high quality high productivity
c) low quality
Assess productivity? Ask them about the tech stack. What design software? How are cut lists created. Is there CNC in shop. Are parts labeled? Do installers have an app?
@shawngorham flooring first.
a) flooring 2nd = damaged cabinets
b) reduced flooring labor as less exact trimming req'd
c) when you have transitions - it is easier to get levels and transition details before cabinets go in.