“Ride is never boring, nah I say it’s never better, than riding on an Orange Line train to Vienna.” trains good. Tufts CEE ‘26. Go Sox. Jazz enjoyer. they/them
@alanthefisher Ride the Metro out to Wiehle, Vienna, or Shady Grove (assuming it isn’t raining) to see what it’s like to go 75 mph. The tunnel under the Potomac going outbound (Foggy Bottom to Rosslyn) is 75 as well (65 inbound). ATO and Design Speed is awesome
On this day, 48 years ago in 1977...
The Red Line extension to Dupont Circle opened! The first ever Metro extension from Farragut North, the 1.1 new miles of track only included Dupont Circle.
Today is the last day of DC Circulator service across all remaining routes. Service will end at 9 PM. We extend our heartfelt gratitude to our riders for their support over the past 19 years and appreciate the community’s understanding during this transition.
Share the news! Downtown Blue, Orange, Silver construction will wrap up a day ahead of schedule and under budget. Normal service will resume on Monday, Dec. 30, following 10 days of critical track repairs and infrastructure upgrades. Learn more: https://t.co/RgVuve9vW7 #wmata
@BarredinDC@JoeHeim@wmata Loudoun Gateway is also the location for the Dulles Yard employee shuttle. I don’t know if employee taps are counted in this metric but if they are the true ridership for the station is even lower.
@walkinghispath@hankgreen Keep in kind this is at 3am, usually the low point in terms of demand, so natural gas’s influence is typically much higher (above 50%)