@reliancejio@JioCare raised complaint on 06 Oct the Service request was closed without resolving issue. I called jio care they informed SR is resolved and not closed. so they will work and send the engineer. Still no one came to resolved. Can you help here.
@delhivery the awb no 37910910318905 is not yet delivered and staus on your site is wrong. There was no attempt to deliver the product as i was working from home and no person came. I also checked the security and no entry found. Lets no loose the trust with wrong status
Mira-Bhayander's first line, Metro Line 9, is ready and with this Dahisar East will become the pivotal station that connects Metro Line 9, 2A and 7.
✔️ Alight at Dahisar East, get down to concourse level and follow the signboards. No need to exit, no further security checks just a short walk and change lines seamlessly.
✔️ Here we show you how to switch between lines at Dahisar East metro station.
मिरा-भाईंदरची पहिली मेट्रो सेवा - मेट्रो मार्गिका ९ आता सज्ज आहे.
✔️ या माध्यमातून दहिसर पूर्व हे मेट्रो मार्गिका ९, २अ आणि ७ यांना जोडणारे एक महत्त्वाचे केंद्रस्थान ठरणार आहे.
✔️ दहिसर पूर्व येथे उतरल्यावर कॉन्कोर्स लेव्हलवर या आणि मार्गदर्शक फलकांचे अनुसरण करा. स्थानकाच्या बाहेर जाण्याची गरज नाही तसेच पुन्हा सुरक्षा तपासणीचीही आवश्यकता नाही. केवळ काही अंतर चालून तुम्ही सहजपणे मार्गिका बदलू शकता.
दहिसर पूर्व मेट्रो स्थानकावर मार्गिका कशा बदलायच्या, हे आम्ही तुम्हाला इथे दाखवत आहोत.
#MumbaiInMinutes
#MMRDAMovesMumbai
#Metro9 #DahisarEast #Interchange
@CMOMaharashtra@Dev_Fadnavis@mieknathshinde@DrSanMukherjee@IAS_Rubal@MMRDAOfficial@TheINIofficial@IndianTechGuide
@mahanagargas My gas connection installation is being intentionally delayed since I applied online and did not take the connection through the MGL representative. While speaking to the representative, he mentioned that. Application id WG-O-522371-2025
Pls Check in system
@NoBrokerCare Booking ID LL-9325966 is pending with landlord biometric. I am following from 19 nov 2025 but everytime no broker confirms that it has been scheduled 8 pm but no one comes to do biometric and it is happening from last wednesday. Pls look into the matter.
Metro Line 9 – Phase 1: A New Lifeline from Kashigaon to Dahisar East!
Metro Line-9 Phase 1 is set to transform everyday travel for Mira-Bhayandar residents by opening up seamless connections to Mumbai’s key hubs:
• CSMIA Airport via Lines 7 & 7A
• Andheri (W) via Line 2B
• Ghatkopar via Lines 7 & 1
• Link Road through Line 2A at Dahisar (East)
• Thane (future link via Line-10 at Miragaon)
• Vasai-Virar (future link via Line-13)
Fast, convenient, and integrated – Metro Line 9 is a game-changer for suburban connectivity!
#MahaMumbaiMetro #MetroLine9 #MumbaiInMinutes #EfficientConnectivity #EcofriendlyTransport #MumbaiMetroRegion #PublicTransport #RebootingMumbai #ReshapingMMR #MMRDA50
@DrSanMukherjee@IAS_Rubal
Wishing you a day filled with love and happiness. May this year bring you prosperity and all good things come your way. Happy Birthday @DhirajRMishra21 🎂💐💐
Mumbai Metro Line-9 (Andheri East - Mira Bhayandar)
Double Decker Metro,, It will somehow solve the traffic congestion of Mira Bhayandar.
Full Video - https://t.co/Lf8NWJGr7s
#Mumbai#Mumbaimetro#line9
@AxisBank never requested for any personal loan. Why i am getting this message. Your request for Personal Loan is registered with us and the reference id is 574984445. For assistance, call Sales Representative on