@CommrAvadiCorp Respected Madam,
I would like to bring to your attention the poor sanitation and irregular waste collection in the Sabhi Nagar, 1st Street, Muthapudupet, Avadi. Sanitation workers visit our street only once every five days, causing waste accumulation.
@CommrAvadiCorp@ambica_jain12 Its been a week still no sanitary workers visiting Muthapudupet 1st Street Sabhi Nagar. Residents don't have another choice they are disposing it on roads. We don't have municipal dustbin too. Kindly take action madam.
@chennai_guy_vsr@Srinivas_091294 But hyderabad city limit includes all 3 corporation (2000 sq km). Not only GHMC. While chennai city limit includes only GCC of 426 sq km.
@namonarayana33@omjasvinMD I think widening the existing and then building an elevated road will be more beneficial for people but that won't happen due to budget concern.
Key announcements made by Minister @AadhavArjuna in assembly today. Finally, a government talks about the poor roads in the Corporations ๐๐ฟ๐๐ฟ
โข An elevated corridor will be constructed from Chennai Lighthouse to Adyar
โข โน2,550 crore has been allocated to upgrade rural roads across Tamil Nadu.
โข Following numerous public complaints, major roads maintained by the corporations of Chennai, Avadi, Tambaram, Coimbatore, Madurai, Trichy and Thoothukudi will be transferred to the National Highways authorities for improved maintenance.๐๐ฟ๐๐ฟ๐๐ฟ
Road delayed is road lost. ๐๐๏ธ
One of Chennaiโs most critical planned arterial linksโthe 10 km AmbatturโOuter Ring Road (ORR) Link Roadโremains trapped on paper while urban sprawl swallows the ground beneath it.
Proposed under the CMDA Second Master Plan, this 61m-wide corridor from Wavin Junction to OOR was designed to bypass chaotic MTH Road traffic, seamlessly connecting the industrial heartland of Ambattur directly to the ORR.
Instead, it serves as a masterclass in urban planning inertia:
Failure to Safeguard ROW Early: Right-of-Way (ROW) corridors were never aggressively notified and land-banked prior to suburban development.
The Cost of Delay: Dense residential layouts grew rapidly across Athipet and Ayanambakkam. Today, acquiring land means facing massive land acquisition costs, litigation, and community resettlement.
Economic Bottleneck: What could have been a 10-minute freight corridor for heavy logistics now forces traffic onto overburdened suburban roads, stalling the true potential of the Ambattur industrial cluster.
When master plans exist only on paper without physical protection of alignment corridors, urbanization outpaces infrastructure every single time.
Until planning authorities prioritize proactive land reservation before development booms, vital links like this will stay locked in presentation slides rather than asphalt.
#ChennaiInfrastructure #UrbanPlanning #CMDA #Ambattur #ChennaiRoads #Logistics #InfrastructureDevelopment
@nscbose24@NewsTamilTV24x7@AadhavArjuna It exactly cuts near Avadi vasantham nagar stretch from Mogappair. Rapidly developing with apartments and commercial space right time to stop that and start the land acquisition. Otherwise, never gonna make it out. If this happens definitely Avadi - Ambattur will be tvk fort