$NBIS
“Expert on neoclouds” and he doesn’t know that Nebius is not looking for any bare-metal contracts from these leading frontier labs/hyperscalers. These contracts were used as a bridging strategy for easier financing of the buildout.
This is why it is important to know what you own. Someone calls himself expert and yet he has no idea what he says…
@Dazzerd93@SMASIMHO I don’t think this is asset-light model. Nebius was meant to design the DCs to its own standards using partner funding. Not sure that could’ve been done by early 2026, yet they’d been on the website since May.
$NBIS PSA: If you’re still using this Nebius logo with the stylised “U” in your posts, you’re behind the times.
The refreshed ones are here for download: https://t.co/IbbuKJ2KdK
Also, the lime green versions are way cooler (IMHO) 😎
@Funmentalist 170 MW were already operational in 2025. The 2025 power CapEx included all the generators in Vineland, if that’s what you’re implying, since the generators had already been delivered in early January. As I understand it, Bloom Energy will be paid through OpEx rather than CapEx.
@Funmentalist One could assume that the buildings had already been constructed and the land acquired in 2024 for 2025, which would explain the lower CapEx. However, this was not the case. Moreover, in 2025, buildings were constructed and land was acquired to be filled with capacity in 2026.