Subcontractor? Don't redraw the main contractor's programme in Excel. Open their P6 file, filter to your trade and link your detail to their activities. Free for up to 50 activities: https://t.co/Z4QHRx2oQM #Subcontractor
Gable roof on a semi, two slopes 7.4 m x 4 m run at 40°: 77.3 m², 812 interlocking tiles, 70 battens, 2 rolls of felt. Free roof tile calculator in your browser: https://t.co/hfytj3kq2Z #roofing
INSANE Voxel Renderer meets Fable 5.2
I had a feeling it maybe could do it. So Fable 5.2 ported my Cuda voxel renderer to Vulkan today. It made mistakes at first, as I made it do things certainly not in its training data. Though I have been sat on the techniques for many years - and it still did some things wrong that I have to fix😁
Running at 4k on a RTX5090.
Total float: how far an activity can slip before completion moves. Free float: before the next activity moves. Block A's windows have 5 days of one and none of the other. The critical path and float, explained: https://t.co/Xz3LTaWinh #ConstructionPlanning
Sent a P6 programme and don't have Primavera? Open the .xer in your browser, nothing uploaded, see the logic problems and what drives each key date. Free to open and view, any size: https://t.co/Du4iDY3SP7 #Primavera
A construction programme is activities, durations and logic. Get those right and the dates and the critical path work themselves out. A house extension from a blank page in 30 seconds, free in your browser: https://t.co/u8v8rf6ydd #ConstructionPlanning#Construction
3.8 x 3.3 m bedroom, 2.4 m high, door and window off, walls and ceiling: 17 sheets of 2400 x 1200, 937 screws, 1 bag of jointing. Free plasterboard calculator in your browser: https://t.co/11vCRQE0jV #plasterboard
Rebar kg/m = diameter² ÷ 162. H20 = 2.469 kg/m. A 4-line ground beam schedule weighed in one go: 85 bars, 236 m, 284.1 kg, split by bar size. Free, in your browser: https://t.co/nFDPaDuHeF #rebar#estimating
I'm starting to sense a divide in the tech industry:
- People thriving on autonomy who are reinventing how they work and what tools they use with AI: LOTS of work, but they're enjoying it and getting very efficient
- People used to being mentored / trained / or simply told what to do and how. Frustrated with the lack of guidance from management on what to do with AI; also frustrated by seeing some of their peers thriving; increasingly bitter about AI and the state of the industry, as a whole
Neither group seems to be aware that there's another group, or have empathy for the other group
Garage slab 6 x 3.5 m at 150 mm, plus 22 m of strip footing = 7.1 m³ and 90 bags of cement (1:2:4, 10% waste). 30 seconds, free, in your browser. https://t.co/oiGk9GSatT #concrete#construction