BREAKING: Tesla has announced Megablock, their next-generation battery energy storage system that uses the all-new redesigned Megapack version 3.
Megapack V3 will be manufactured in Houston in late 2026, with a 50 GWh production capacity.
• 23% faster installation
• 248 MWh per acre
• Can install 1 GWh in 20 business days, equivalent to power for 400,000 homes
• Uses a supped up Model Y heat pump
Cloudflare: Shit we hired too many people. Let’s fire them by saying they suck at their jobs instead of doing layoffs
Employee: Ha not so fast. Got your ass lying in 4K
CEO: Hey don’t blame us, Chris Paul was fucking awful on the Suns
Chris Paul:
An ant is inside the box, 1 cm from the bottom, and wants to go eat the drop of honey on the opposite side, 1 cm from the top. Crawling on inside of the box, what's the shortest distance the ant can crawl to get to the honey?
h/t @Awesomecloss