@SirgurohAbid@mybmcWardE Back to the Future Hollywood ne banayi thi , ‘Back to 16 June after 20 June’ ka sequel shayad @mybmcWardE produce kar raha hai , Ticket free hai, credibility mehengi padh rahi hai.
@mybmc, if Ward E believes “including” means “optional”, perhaps someone should conduct a basic comprehension test before assigning public duties.
Citizens filed 11 complaints , AMC asked for a complete report , The public got an edited version , Transparency isn’t achieved by reporting only the comfortable pages of the file.
Amazing efficiency by @mybmcWardL BMC L Ward 👏
Illegal construction at Janta Baba Compound keeps going despite 354A notice, FIR at Kurla PS, speaking order, demolition drama, ignored RTI & ignored appeal.
AE Torane & JE Manoj Hulge clearly believe rules are optional and duty can wait forever.
Such “dedicated” officers deserve not suspension… but dismissal.
@mybmc #BMCCorruption
@CMOMaharashtra@AshwiniBhide@TawdeRitu
@SirgurohAbid@mybmc जब अवैध निर्माण नोटिस के बाद भी चलता रहे, तो सवाल सिर्फ लापरवाही का नहीं रहता , सवाल यह उठता है कि इस खामोशी की कीमत कौन चुका रहा है ?
Serious corruption concerns in @mybmcWardL BMC L Ward (Janta Baba Compound, Beat 168).
An illegal G+2 construction was issued a 354A notice in Jan 2025, yet work continued openly. When BMC staff tried stopping it, contractor Anees’ goons allegedly assaulted officials, leading to an FIR at Kurla Police Station — still, construction was not stopped.
After 6 months, a Speaking Order was issued in July 2025. Shockingly, corrupt B&F officer AE Torane (previously suspended in a corruption case and still under enquiry), along with JE Manoj Hulge, woke up only in Oct 2025 for demolition.
Even then, no Panchnama, no cost recovery, and no proper MMC Act procedure was followed.
I filed an RTI in Feb 2026 — no reply. First Appeal — no reply. Hearing held on 24 June 2026, where I was shown a backdated reply copy dated 23 June 2026.
This is how accountability works in BMC L Ward.
Officers like AE Torane should not be suspended — they should be dismissed.
@mybmc #BMCCorruption #MumbaiCorruption #LWard #StopCorruption
@SirgurohAbid@mybmc A verification process that stretches beyond two months raises a simple question: Is the delay procedural, or is it protecting someone from scrutiny ?
@SirgurohAbid@mybmcWardE Public trust is built on facts, not timelines that appear to run in reverse. Explain the records instead of expecting the public to ignore them.
@SirgurohAbid@mybmc@mybmcWardE The greatest ally of unauthorized construction is not concrete. It is official silence, delayed action, and accountability that never arrives.
@mybmc In L Ward, a structure reportedly demolished in 2025 has allegedly reappeared as a G+2 building, with construction of a third floor now said to be underway under the pretext of a court matter.
AE (I/C) Torne, who has reportedly faced suspension in the past in connection with a corruption-related matter, is now facing serious questions again. If a demolished structure can rise once more under the same jurisdiction, what exactly is being enforced ?
JE hulge and the entire enforcement machinery also owe the public an explanation.
If the alleged illegal construction is visible on the ground, why is immediate statutory action missing ?
Selective enforcement undermines public confidence and the rule of law.
@mybmcWardL@ashwinibhide@CMOMaharashtra@maharevenue@TawdeRitu
#BMC #Mumbai
#ShowSomeShame
A classic case of 'demolition' turning into a VIP renovation in @mybmcWardL
It was demolished in Oct 2025, but miraculously rebuilt without BMC interference. Allegedly, JE Manoj Hulge, AE Torane, and DO Beldar are the architects of this resurrection. If a court stay is being openly flouted, this is textbook contempt. Courts must act against this open defiance of the rule of law. @mybmc@AshwiniBhide
#Mumbai #BMC #Corruption #ContemptOfCourt
@SirgurohAbid No office is powerful enough to stand above the Constitution. Public authority derives its legitimacy from obedience to the law, not discretion in choosing when to follow it.