@Toptech500x@Maha7Arindam Which is okay But if we want navi Mumbai to thrive we need more office spaces.
Bangalore is creating office spaces in every random outskirt. That place in Kharghar is ideal for it. Rents in that area are low too
We have to build commercial and then new companies will come in.
I like the optimism in planning expansion in India lol
>Mumbai metro L1 is still not made 6 coaches(ik the problems)
>Suburban railway quadrupling or 5/6 tracks takes decades and even the expansion didn't increase the capacity
Planning karenge raat bhar
Implementation jhat bhar
@ShivamVahia This guy is all about PR.
Bc 7 ring road.
Bhai main bhi bolta Boisar main 10 ring road hai.. falana dhinkana road + NH 48 + dahanu coastal road.
Bc kuch bhi logic.. bas public ko chutya banao.
Dude cannot build and commission Metro lines in Mumbai 1.0 but chala bada Mumbai 3.0 ka gyaan pelne.
And look at this desperation + cowardice, as MMRDA chief he's giving an interview to some random Delhi focused newspaper that has less readers than passengers at Kharbav Railway Station.
Why? Because a Mumbai-based newspaper or journalist tracking infra cannot be fooled, or easily bent.
@AmeyKulkarni_21 I feel the biggest mistake is the failure to create new lines and new areas.
Vasai/Virar/Kalyan/badlapur have been the places where people could buy a house for decent amount and commute to SoBo.
Why we still don't have fast line from panvel .
@DelayMeter_IN@vasaivirarinfra@snehadubepandit No chance it's done by 2028.
Even virar - dahanu 3rd and 4th line was for 2025.
Some part might start in 2027 and finally total thing will start in 2028.
You got to be realistic with these things.
Different perspective on that Mumbai photo:
One side took a huge home loan EMI and is still paying it(30 years). The other side occupied government land, built 4–5 sheds, and is renting them out.
One side pays ~30% income tax + property tax + GST on the flat + stamp duty + indirect taxes on every construction material. The other side may eventually get an SRA apartment at a throwaway price (sometimes almost free).
One side regularly gets a property tax bill. The other side… let’s not talk about that.
Yes, it’s rich vs poor. We dont know who is rich here and who is poor.
We must stop portraying the rich as villains and the poor as cursed. Look at the incentives the system has created — then ask who is actually better off.
" ▪️Ashoka Buildcon has now emerged as the lowest (L1) bidder for this package with a bid of ₹1465 Cr.
▪️Ashoka Buildcon was recently awarded the construction contract for Package 9 as well."
Lovely to hear, this should get done in 1.5yrs now !!
@Toptech500x@shinde_sanket_2@victortangodkm@BHiren Kya timepass chalu hai..
Ek line jiska depot hai uske alag vaande bc.
They are saying march 2027 to start, lol, bohot kaam bacha hai.. I will say testing start in March 2027.
Chalu karte karte October - November.
New Metro line Alert!
Thane (TRIM)- Thane HSR- Dombivali - L12 Sonarpada proposed metro line tenders called for DPR preparation
Possibly will run via Kalwa-Mumbra-Diva belt reducing the crowd on CR mainline
@kunalkamra88 This is how the “Aman ki Asha” fraud was shamelessly peddled to us while the Pakistan Army was beheading our soldiers & playing football with their severed heads.
Their terrorists were carrying out bomb blasts that routinely slaughtered hundreds of Indians every single year.