@ramidea150@KTRTRS@KTRoffice@GHMCOnline Sir the HMWSSB has laid the pipeline crossing damaging slab and relaid improper slab which is again damaged. The damaged slab portion will be laid after elections. Inconvenience regretted.@
@PVSIVAKUMAR1@ysanthoshreddyy @zcwz_ghmc @CommissionrGHMC Sir the existing swd was closed with RCC precast slabs and was completely filled up silt.Recently desilting has been done after 15 yrs n during desilting some slabs got damaged n will be relaid at an earliest
@ysanthoshreddyy Sir while desilting the storm water drain near balajinagar nala the old slabs have been damaged and new precast slabs are proposed and is in tender process. @KTRTRS @zcwz_ghmc @GHMCOnline @ZC_Kukatpally