@drmgtl@RailwaySeva@SureshKuma30395 Sir, GTL Station PF 6 &7 tap rotation fixed & earlier a mirror was provided. Unfortunately, it was damaged by someone. The mirror has now been replaced please.
@SureshKuma30395@RailMinIndia Sir, GTL Station PF 6 &7 tap rotation fixed & earlier a mirror was provided. Unfortunately, it was damaged by someone. The mirror has now been replaced please.
@Srdcmgtl@drmgtl@SCoRAILWAYVSKP@ravvyyee@RailMinIndia@IR_CRB Sir,We have strictly told the agency to clean the front circulating area,repair the broken pathway,&maintain in the cooking zones to eliminate foul smells.Furthermore,detailed estimate for extending the shelters on PF6&7will be submitted once the SODfeasibility is verified
@drmgtl@RailwaySeva@DurrezkhanZ SIR Pf no.1 is supplied with ROwaterforDrinking purposeRestoffthePFareSupplied with normal water peak seasoninsummerallwatersourcesareat their lowestlevelscausing more colorandturbid even aftertreating thewaterWeill furtherincrease the to avoid color in water supplied to station
@drmgtl@RailwaySeva@rscvreddy Sir All these grown up trees are lying within the fouling distance of OHE wires and they are removed as per the joint inspection notes of OHE & ENG departments.This is mandatory to remove such trees in order to prevent any untoward incident and likely disruption to tran traffic
@drmgtl@RailwaySeva@rahul_roy85 Sir At hx station ,abss station development works are in https://t.co/cIfUkVn3fo abss scheme on pf 2(from gtl end to station ) platform raising work is completed.From station to ru side , new fob & new shelter work is in progress after that platform raising work will be completed
@drmgtl@SCRailwayIndia@seshadrinathk@gmscrailway Sir As per Sr.DEE/Tr./GTL ler no:G/E.250/TRD Correspondence/drive,dated 16.02.2026.Trees which are infringing to OHE wire and susceptible for falling in viewof monsoons are jontly inspected and infringing trees are being cut,As a compensation planning plantation on ART MRV side.
@drmgtl@RailwaySeva@SureshKuma30395 SIR
At hx station , abss work is in progress , under the abss scheme, on platform 2&3 new lift will be provided
At present it's connecting new fob of 12m wide foundation work is in progress
@SureshKuma30395@RailMinIndia SIR
At hx station , abss work is in progress , under the abss scheme, on platform 2&3 new lift will be provided
At present it's connecting new fob of 12m wide foundation work is in progress
@SureshKuma30395@RailMinIndia SIR
At Hx station ,abss work is in progress, under at the abss scheme ,on platform 2&3 new lift will be provided
At present its connecting new fob of 12 m wide foundation work is in progress
@drmgtl@RailwaySeva@bvprasadreddy Theplatform extension work at JMDGstation has been sanctioned during the current month,and execution of the work is planned to commence this week.The work will be taken upon a war footing to ensure that the platform becomes sufficient for handling24/26LHB coaches at the earliest.