The "Easy Button" of Tyranny
That’s it. That’s the whole game.
We get our elections back, we get our country back. Period.
When We The People secure the vote—ensuring only eligible voters are tabulated and every ballot is counted accurately—we instantly restore 90% of our liberty in a single election cycle. Within a year or two, the entire nation is restored.
Why? Because corrupted, manipulatable elections are the "easy button" for bad actors.
They spent decades building this system. They don't have to waste time with old-school tactics like bribery, blackmail, or threats anymore. All they have to do is put a puppet on the ballot, fix the machine, and boom—they're in power.
It’s efficient, it’s effortless, and they love it.
But the game is changing. They are furious right now because everyday citizens are finally waking up, looking under the hood, and noticing exactly what they did.
Secure the vote. Strip away their power. Take back the nation. 🗳️🇺🇸
#SecureTheVote #WeThePeople #ElectionIntegrity #TakeBackAmerica #Liberty #UntamedNation #JoeOltmannUntamed
Being Patriotic
Happy 250 America
Joe’s Conversation With @PatriotMarkCook
Please check out Joe’s Givesendgo at: https://t.co/41MSGyma8E
Text Freedom to 89517 to get alerts
https://t.co/OArP4Dyyb4
Make sure to check out https://t.co/Fmsj6EHXKj for all your Untamed Nation merch needs!
Go to https://t.co/l027W1pAvg to get FREE TINA stickers and use Promo Code “FREETINA” for 20% off!
It’s time to dig into Griswold’s rise to power.
She was placed in the Obama campaign infra via @Hickenlooper
She married an Islamist hacker while in DC after graduating from IIRC Penn law. She then comes back to CO painted as a pauper. Goes dark for a bit, positioned as a lawyer with a private practice that somehow goes from zero revenue to millions.
And voila - hits the political circuit branded as “the youngest SecState in history” with Soros backing.
Weirdly, Griswold goes from rags to an estimated bank account between $5 - 10M.
Fast forward to her “winning office” where she has an 80% staff turnover rate until Deputy SecState Chris Beall takes over CDOS operations from his position in COAG.
Years later, on the stand, in our trial (totally frivolous and proved so via a 52c verdict) Beall states he runs CDOS including all staff, monitoring CDOS staff voting history AND monitoring what CDOS open records requests get approved.
MEANWHILE: Where’s Jena? Oh wow. Office is in disarray as BIOS - election tech passwords are freely available on the web.
Why is this important? These passwords allow anyone - LITERALLY ANYONE tech access to election tech equipment functionality.
Once discovered - Beall & Griswold HIDE this info from CO County Clerks (who are responsible & LIABLE) for conducting legal, fair & accurate elections DURING A LIVE ELECTION. They hid this massive security blunder because they feared a “media circus”
The result? CDOS is allowed to investigate themselves for any wrongdoing. 🤣
The investigation was so sus, that even Polis had to intervene.
In the end - the scandal dies quietly thanks to the lack of reporting by CO news all-stars @KyleClark@qpyoungnews @ericmaulbetch et al.
However @AsheinAmerica@canncon@NeilEJohnson@ShawnSmith1776@KevinMoncla@EmeraldRobinson@michellemalkin@Joeoltmann@ElJefe53209440@realkarenjean and many others kept this story alive.
So now… Griswold is the CO AG candidate in the midterms. Even after this mini scandal - that doesn’t even touch the real BS… nevermind her election fundraising fraud issues when she stepped out trying to run as CO Gov and was shut down by her buddy Phil Weiser.
Want more info? DM me. I’ll effing go there
@ForestMommy@MJTruthUltra@BehizyTweets@mrddmia@Bannons_WarRoom@POTUS@HarmeetKDhillon@JeffClarkUS@theprofsrecord@mrosazza@dobetterdnvr@libsoftiktok
It’s so strange to say and hear my self saying it, but we’re actually thinking of moving out of the state. Retirement on our mountain property is no longer sounding good. We’re investigating Florida. Colorado is a madhouse. It’s about to hit the gutter. We’re just so done.
UNBOWED: TINA PETERS ON PRISON & PERSEVERANCE & Why She Will Not Stop Fighting Election Fraud | Going Rogue with Lara Logan | Ep 87
Tina Peters is the courageous former Mesa County, Colorado clerk who served 606 days in prison after preserving election records she believed exposed fraud in the 2020 election. Peters describes backing up Dominion voting machine data before a system update erased 29,000 records, leading to her prosecution. She discusses the suppression of key evidence during her trial, inhumane prison conditions, and ongoing legal battles. Despite losing her freedom, home, and family relationships, Peters remains committed to fighting for election transparency and continues advocating through her website, https://t.co/AT2NulgJkh.
00:00:00 The Stolen Election Cover-Up Begins
00:00:31 Tina Peters: Election Martyr Released From Prison
00:02:36 How Dominion Voting Machines Erased 29,000 Election Records
00:04:16 Tina's Divine Vision: Walking Through Fire
00:05:44 The 2021 Rigged Municipal Election Nobody Talked About
00:10:25 Wireless Devices Found in "Offline" Voting Machines
00:15:35 Supremacy Clause: Why Colorado Had No Right to Prosecute
00:20:13 The Deep State's Deal: Recant or Go to Prison
00:34:05 606 Days: Surviving the Horrors of Political Imprisonment
00:41:53 Election Theft in Real Time: Votes Flipping Before Our Eyes
00:47:13 Jenna Griswold's Illegal Recount and the Soros Secretary of State Network
00:54:42 Unbowed: Tina Peters Vows to Keep Fighting for Election Integrity
@COUnfiltered@ScottBottomsCO He's probably resting from actually campaigning. Unlike VM, who didn't do shit and you idiots still voted for his loser ass
This is the person Colorado wants to lead them the next four years? A complete ideological nut job? He lets all the criminals free, all the medicaid fraudsters steal our tax money? He is in deep with the technocrat software hedge funds in Boulder? He looks like the nerdy backroom villain in a Bond Film.
A lot is about to come out about Phil Weiser, and none of it is good. #copolitics
Reminder Colorado:
Jena Griswold (CO Sec. of State) faces these active lawsuits:
• US DOJ v. Griswold - demanding full unredacted voter registration data (filed Dec 2025)
• RNC et al. v. Griswold - challenging overseas “never-resident” voter eligibility (filed June 2026)
Elections office stays busy in court.
Allegedly, there are more coming 👀
The destruction of Colorado continues if these two get into office. Think about it - more homeless in Denver - more taxes and fee robbing us of our economic freedom - fewer and fewer freedoms - losing parental rights, losing our gun rights. We need to vote out Dems in Congress to keep our country Free and Prosperous!
Mesa County, Colorado Dominion System Was WIDE OPEN, any computer in the WORLD could connect to the EMS server and flip votes with a few clicks in the 2020 Election.
36 wireless devices, global SQL access via port 1433, uncertified software, and live vote manipulation DEMONSTRATED.
Certification was illegal. System should have been decertified immediately. This is the 2nd forensic report to Mesa County, Colorado, connected to Tina Peters.
The most significant findings allowed unrestricted global SQL access. The EMS server was configured so any computer in the world could connect directly to the SQL databases via port 1433, default SQL port. Windows Firewall allowed inbound connections from any IP address with no restrictions.
All SQL protocols were enabled. Shared Memory, Named Pipes, and TCP/IP, making remote access trivial.
36 wireless devices identified built into the DVS D-Suite system, 35 in voting components like Dell Latitude/Optiplex ICVA/ICC machines and ICX tablets + 1 Dell E3DW wireless printer on the EMS server. These were vulnerable to known attacks (KRACK).
Self-signed certificate used for encryption, vulnerable to man-in-the-middle attacks. Shared/default passwords for administrative accounts, violating user accountability requirements.
Audit logs overwritten/deleted by design and configuration, building on Report #1 findings. Uncertified software, Microsoft SQL Server Management Studio (SSMS) was installed on the server, May 7, 2017, but not listed in the official certification application or test report for DVS D-Suite 5.1-CO.
Live vote manipulation was demonstrated using SSMS, changing just two values in the dbo.Choice table, internalMachineId for candidates, flipped vote totals between candidates, one example altered tens of thousands of votes in the demo. Multiple election databases, including 2020 General, municipal, etc., were fully accessible and modifiable.
Anyone at a logged-in EMS server could alter databases in seconds with SSMS. From any non-Dominion computer on the same subnet. From a cell phone/iPhone connected to the network using a free SQL app, successfully identified the server and modified data.
These are HUGE security risks of enormous proportions, compromising the 2020 Election in multiple ways with multiple attack vectors.
SOCIALISM: This will be the youngest member of Congress from Colorado. She has no understanding of economics, history, much less human nature. America won’t survive if we allow African-born socialists to rule us.
At the state assembly, the person (don’t know his name I’m sure many do) that was paid to come in to do BRITA HORNS JOB announced “I’m sorry we didn’t do a good job, the credentialing numbers are wrong and we are sorry”
You don’t say that unless there’s cheating. It took us 5 hours to get inside and people were tired,… too tired to do anything close to a recount. I’d say that was planned like the old used car salesmen trick … who knows but the cheat was coordinated to a T, they even had a list with PICTURES of who to watch, and follow and those not to allow in the facility and so on (these were grassroots delegates like Dave Williams) The security plan was dubbed Nancy’s (palozi)… I almost wrote Palosi and it fits but it’s their brain child while their elected state chair sat and watched bc she was voted to be on the sidelines. They had it allllllllll planned except we started 5 hours way late and a few heat strokes later.
Marx had the VIP shadow box above, only coming out when he has to surrounded by his 20 paid security personnel. Special treatment much?
The campaign violations from the very beginning - filed and investigated to be VALID,… just ignored and then about 3 weeks ago: dismissed. Plain ole dismissed. I got the email stating as such.
No one would have voted for David that didn’t also vote for scott. It’s plain and simple. And just like at assembly when we knew Victor did NOT have the signatures needed for DISTRICT 1 (he faked that he did- he didn’t which is the reason he needed the assembly’s 30%) he also didn’t have the votes at assembly and they then took from scott’s (and others I’m sure) then too.
He was always THE FIX. Why didn’t he at least TRY to debate, TRY TO LOOK the part on a 9 News debate stage? Bc he was THE FIX and he KNEW IT.
It isn’t close. It’s just the cheat.
This is why Pulte needs to declassify everything. When government agents can keep secrets from the American people, they can and will engage in dirty business. Just look at G Gordon Liddy and the Watergate Scandal.
Former CIA Officer Drops Bombshell at MKULTRA Hearing: “I Don’t Believe the Research Stopped” — Luna Says Congress Was Lied to for 50 Years
https://t.co/3H5cO85f17