Prime Minister Mohammed S. Al-Sudani presided today over the signing ceremony of the Joint Operating Agreement (JOA) between Iraq’s Ministry of Oil, TotalEnergies (France), Basra Oil Company, and QatarEnergy. The event was attended by Qatari Minister of Energy Mr. Saad Sherida Al-Kaabi, TotalEnergies CEO Mr. Patrick Pouyanné, Chairman of ENKA (Türkiye) Mr. Mehmet Tara, Vice President of CPECC (China) Mr. Liu Kai, and Chief Operating Officer of Hyundai (Korea) Mr. Ryu Seongan, in addition to the Deputy Prime Minister for Energy Affairs and Minister of Oil, the Prime Minister’s Advisor for Energy Affairs, the Deputy Minister of Oil for Extraction Affairs, and several senior officials from the Ministry of Oil.
The Prime Minister welcomed the Qatari Minister of Energy and the CEO of TotalEnergies, along with their delegations, in the presence of the Iraqi Minister of Oil, the Prime Minister’s Energy Advisor, and the Deputy Minister of Oil for Extraction.
In his remarks, Prime Minister Al-Sudani congratulated the parties on signing the agreements, emphasizing that the growth of Qatari investment, and foreign investment more broadly, in Iraq reflects the country’s improving investment climate. He reaffirmed that the Iraqi market is open to reputable and committed companies to participate in all sectors, particularly infrastructure, economic development, and public services.
The Qatari Minister conveyed the greetings of His Highness the Emir of the State of Qatar to the Prime Minister and expressed his country’s desire to expand cooperation, investment, and long-term development partnerships with Iraq. The CEO of TotalEnergies also reaffirmed the company’s commitment to growing its operations in Iraq, citing the country’s significant economic progress and improved national security.
The signed agreements include:
1. Joint Operating Agreement (JOA):
A joint operating agreement between the Ministry of Oil (represented by Basra Oil Company), QatarEnergy (representing the Qatari Ministry of Energy), and TotalEnergies, which will serve as the lead operator for the Artawi Field under the Gas Growth Integrated Project (GGIP).
2. Seawater Treatment Facility (STF):
An agreement between TotalEnergies and Hyundai (Korea) for the construction of a seawater treatment plant with a design capacity of 7.5 million barrels per day. The treated seawater will be used for injection into southern oil fields to increase reservoir pressure.
3. Central Oil and Gas Processing Facility:
An agreement between TotalEnergies and ENKA (Turkey) to construct a facility with a daily production capacity of 210,000 barrels of oil, 163 million standard cubic feet of gas, and 240,000 barrels of water for injection. The facility will also incorporate zero gas flaring technology.
4. Gas Processing Plant:
An agreement between TotalEnergies and CPECC (China) to capture and process associated gas from Artawi and nearby fields. The plant will have a total capacity of 600 million standard cubic feet per day, implemented in two phases of 300 MMscfd each.
In conclusion, Prime Minister Al-Sudani urged all stakeholders to accelerate implementation, particularly the components related to gas production and clean solar energy generation. These efforts will contribute to the national power grid with an additional 1,000 megawatts, to be delivered in phases starting early next year, God willing.
Traditional boats that once navigated Mesopotamian rivers are returning to Basra's waterways through the Maritime Revival Project, a local heritage initiative
💡 🇮🇶 Concrete progress for energy in Iraq!
TotalEnergies and its partners Basra Oil Company and @qatarenergy launched today #ArtawiGas25: a facility to process 50 million cubic feet/day of gas previously flared. The gas will supply power plants that bring #electricity to 200,000 households in the Basra region. 🏠⚡
A step towards reducing gas flaring at the Ratawi field and improving local energy supply, while creating local jobs. 🚀
To learn more: https://t.co/Qrv2dcZDF6
#TotalEnergies #EnergyDevelopment #Flaring #GasFlaring #Basra #Iraq
💡 🇮🇶 Concrete progress for energy in Iraq!
TotalEnergies and its partners Basra Oil Company and @qatarenergy launched today #ArtawiGas25: a facility to process 50 million cubic feet/day of gas previously flared. The gas will supply power plants that bring #electricity to 200,000 households in the Basra region. 🏠⚡
A step towards reducing gas flaring at the Ratawi field and improving local energy supply, while creating local jobs. 🚀
To learn more: https://t.co/Qrv2dcZDF6
#TotalEnergies #EnergyDevelopment #Flaring #GasFlaring #Basra #Iraq
Yesterday, we were honored at TotalEnergies EP Ratawi Hub, to welcome his excellency, Iraqi Minister of Oil to our site.
His excellency disused the development of TotalEnergies project in Iraq, Gas Growth Integrated Project (GGIP).
This year, #TotalEnergies will measure CO2 and methane emissions in Iraq using a new technology known as #AUSEA.
This was presented as part of the Gas Growth Integrated Project (GGIP) during the recent Basra Oil & Gas Exhibition.
🎉🎂 100 years old today… #HappyBirthday@TotalEnergies! This March 28th, 2024, we celebrate a century of pioneering spirit, perseverance, and innovation in the #energy sector! ⤵️
Ahmed presented photos he took at #COP28 to show how climate change continues to impact southern Iraq.
Photos illustrate the low water levels and drought where the local "Mashhouf," or small boats, use the canals as transportation routes.
📷 @AhmadKadhum93
Even though the Iran-Iraq war ended more than 30 years ago, search teams are still discovering sets of human remains.
The ICRC continues to support both parties in giving missing persons' relatives answers.
📸 Ali Khaleel
Today, under the auspices of @ICRC, a transfer of human remains was conducted between the Government of Iraq & the Islamic Republic of Iran at the Shalamcheh border crossing. These remains belong to Iraqi & Iranian soldiers who went missing during the Iraq-Iran war of 1980-1988.
Time does not heal, only answers do. Families have the need and the right to know what has happened to their loved ones. Resolving a case of a missing person is often a complex and lengthy process.
📸Mr Madah holds his missing brother's photo.
#InternationalDayoftheDisappeared
Extreme heat, power cuts and temperatures hitting over 50 degrees add to #Iraq`s vulnerability being one amongst the top five countries affected by #climatechange in the world.
Back in the times - children in Basra find a way to escape the summer heat.
Over 30 yrs have passed since the Iraq-Iran war. But thousands of families are still waiting for their loved ones.
On 20 Jul, an exchange of human remains of soldiers who went missing in this war happened in the presence of both states' representatives under the auspices of ICRC