$6.7T is going toward data center capex through 2030. It still takes 10-12 months to design data centers.
@MarengoYCS26 is the engineering firm for accelerated data center development. Site Due Diligence through FEED and Permitting Design in half the traditional time and cost.
Data center design takes 10-12 months, and because every concept is manually produced, design firms explore only 3-4 options per site, leading to suboptimal designs, risks that surface late, and delays that cost developers.
Marengo reduces those traditional pre-construction cycles down to 5-6 months by automating iterative engineering processes, allowing for faster design iterations, earlier constraint and risk visibility, and higher-confidence decisions, turning early development speed into a lasting advantage.
Our professional engineering team uses in-house-built AI tools to accelerate the work, validating and choosing the best designs for you. They present you with a decision-ready package built from data and expertise, at every stage: Due Diligence, Feasibility, Concept, and FEED/Permitting Design.
Before YC, @gadmarconi and I helped build and deploy on-site data center infrastructure, worked on the world's most powerful magnets (56MW) at the 1.4GW MagLab facility, spent time as an AI software engineer at a nuclear and energy EPC, as well as published multiple papers on AI for complex engineering design. We know firsthand the manual processes that slow down design and lead to suboptimal decisions.
Are you a data center developer? Send a site. Let us show you what accelerated engineering looks like on one of your projects. https://t.co/mPaIKV5KGX