@BjornLomborg I think the chart counts what Switzerland spends but leaves avoided fossil imports at zero. It produces almost no oil or gas. Post-Hormuz, TTF gas up 70% in March. How is that dependency priced in the model?
@renewablesmiffy Spot on. Diesel up 7p/litre and nobody blinks. Meanwhile we hold 2-3 days of gas storage against 90 in Germany, and the debate stays on whether solar is cheap.
@MegaWattXinfo €14bn for what capacity? If it covers 2 or 3 units that's a better €/MW than Hinkley Point C managed at £49bn. I will be watching whether repeating the design gets EDF closer to the original £18bn estimate.
@flexibledragnet No apology needed. I'd only add that state aid covers most of the sector: CfDs for offshore wind, capacity payments for gas. Barakah was sovereign-financed too and still came in on budget. Aid isn't the differentiator. Execution is.
@lfg_uk Bills up 26% while the grid ran 71% on renewables and nuclear for a full week. I do not think the problem is CfD, it is gas setting the price in every hour. REMA started in 2022. Still waiting.
@SamuelleachCeo I don't think this is a one-off. EPL above 75% effective, FIDs deferred, Finch stalling consented fields. When fiscal terms say 'we don't want your capital', companies eventually believe it. How many more exits before the regime gets a proper review?
@curious_founder@elonmusk Spotted the pattern: data centers no longer waiting for grid connections. 750 MW behind the meter in Texas while NESO sits on a 700+ GW queue. Would this even be possible under UK connection rules?
@HopfJames Agreed. The motive ordering matters: energy security first, climate second. I keep coming back to Barakah: 5.6 GW of firm zero-carbon power, four APR-1400s, done in about twelve years. Curious what that build rate implies for Asia's 66 GW.
@krustelkram 189 GW of behind-the-meter gas tells you everything about connection queues. When interconnection takes years, hyperscalers buy turbines and go off-grid. I think most people do not realize the grid loses the load, and everyone else picks up the fixed costs.
@isabelleboemeke The phase-out looks worse every year. But grid expansion is the real bottleneck, same problem we have in the UK. Anyone know the current wait for a large industrial connection in Germany?
@flexibledragnet I'd disagree the economics are irrelevant. Hinkley Point C is at £49bn with zero watts, Barakah delivered four reactors in roughly twelve years. The gap is engineering and procurement, not ideology.
@finipot Institutional subscription will tell you more than the GMP. Where does their pipeline actually sit in the NESO grid queue? With 300+ GW unlikely to proceed, I would want the connection date before reading anything into demand levels.
@PaulMar96566297 If wind didn't blow, why is it covering most of the load in that chart? November is a storage gap, not a generation failure. And that 'reliable' gas backup got expensive fast: TTF up 70% in March.
Well, it depends on how you look at data. A few hundred homes off is a network fault, typically weather damage. Wind output has been strong all week. I would worry less about renewables and more about gas storage at 2-3 days of demand. Germany has 90.
Neets report live: Young people describe 'losing hope' and businesses 'squeezed' - BBC News
How many jobs could be created if the UK built it's own solar & wind farm equipment and other renewable energy needs instead of importing from china? https://t.co/NrTc8PBXZ7
Good chart. 128 quads of supply and the balancing item stays under 1 quad. Does EIA split the stock change by fuel? Gas storage versus crude would tell two very different stories right now.
Our Monthly Energy Review includes a stock change and other data series, a grouping of items that account for the small differences between supply and demand each month. https://t.co/ytF5xxw6gg #TodayInEnergy
I don’t think people fully appreciate just how petty Australia’s anti-nuclear politics are.
In addition to refusing to lift the bans on nuclear power our government won’t:
-Renew Australia’s membership of the GenIV forum for advanced nuclear research that we joined in 2016
-Add uranium to our critical minerals list
-Participate in the ATLAS nuclear shipping initiative from the IAEA
-Sign the global triple nuclear pledge
-Call on the states to remove their stupid uranium mining and nuclear bans
-Or generally say the words ‘nuclear’, ‘uranium’ or meet with Australia’s nuclear experts
(There’s many more examples)
It’s pure ideology.
Impressive jump. The question I keep coming back to: how much of that finance reaches projects that actually get built? CfD awards vs operational capacity shows how wide that gap can be.
@IRENA@WorldBankGroup I'd be interested in whether the cases cover what 'early' means in practice - pre-application or post-application? That distinction decides whether a project is built in 4 years or 8.