@cocteautriplets@SgothanGeal At least since August 2008, if you move Street View along to the junction you can go back further (to when the shop was empty).
@BrianMilne80 @PidginPosting Guy on video says he parks on the main road for the chemist (ok, more chance of a parking space?).
But the blue badge parking in the bus lane is only allowed 9.30-4, which is similar to the Manse Road bus gate which he could also use to get there from 10-2.45.
Usually I'm taking photos and cheering people on at the @BlackRockFive race in Kinghorn but this year decided to take part with my brother and cousin ๐โโ๏ธ๐ฐ๐คช #HarderThanItLooks#ToughFinishUpAHill
@KarenTrotter20 Was there no warning of the closure on the east side before you got to the crossing about 300m before the bridge? I cycled across last week and signs gave notice about the switching sides this week.
@fifeenv@KirstyLewin A long ramp from the platform which runs above the pavement, plus a build out? Not as good as lifts but would at least allow you to get off the platform without using the bridge.
@BryanMackie6 You can see all of the cycle tracks tagged as one way in OpenStreetMap here: https://t.co/w5QvwGnZij
Most of them are mtb routes or short paths however, really only a couple in Glasgow which fit the bill.
@BLister07 @scepticalists @dougalstanton@theSpurtle A photo tweet from last month which shows the HGV driver doesn't bother to use the loading bay even when it is empty.
@tandemkate @david_mccraw@FinlayMcF There's a dropped kerb at the bottom of the photo and another in the distance.
From reading tweets about Leith Walk a flush cycle/pavement wouldn't be good for the visually impaired who want kerbs (and possibly even bigger ones) so what can be done instead?
@ContinualRantin @DaleJohnsonESPN@SamKayze1 Nonsense, we saw the assistant raise his flag at a high angle indicating the offside player was at the far side of the pitch, ie the corner taker.
@deaks1ey @officialpetermc@HaggartyJohn Celtic Park and Ibrox have the system installed as well (used in CL games) https://t.co/EJ0mxXlpJW
Can also be used in the Scottish Cup from next month.
@CalumC_91@justacwab@overlandertheb1 Hmm good point about the northbound crossing conflict - suppose two phases could still work if the crossing was only active once the tram has cleared the junction in phase 1?
@david_mccraw@JeremyRBalfour@Edinburgh_CC @CllrScottArthur @NFBUK@RNIBScotland Difference is, in Glasgow the council removed a lane of carriageway in order to add the cycle track in your picture.
In Edinburgh (where the recent video was filmed) the council kept the same five lanes of carriageway as before.