@Fidelity@rahmbotrades fidelity is for boomers who know how to log into their account check their balance and make 6/7 trades a year
trading options is a nightmare
if fidelity wants suggestions i would say emulate robin hoods options trading platform
Special thanks to @dpa685 for pointing out this section of the 10-Q for $cifr showing how the share count will likely increase to more than 600m shares fully diluted once the company returns to GAAP profitability. These increases to share count got omitted in the current quarter due to the net loss.
The fair value of Barber Lake, Black Pearl, and Stingray is closer to $10.48 per share in my analysis if you increase the share count to 614m shares in consideration of the table below
The additional 477 MW signed for Odessa, Reveille, and Ulysses fully leased is closer to $8.66 if you assume a share count of 649m shares.
The sum of these $18.57 per share for 1.117 GW with an additional 4.1 GW to be leased and an undetermined number of MW from Behind the Meter.
@dpa685 will properly point out that the SGA drag as well as the terminal exit cap rate of the sites in question also present valuation risk downward, but I was trying to do a quick analysis on the fly to show what the existing leases were worth and the premium being priced into the remaining pipeline.
Late night miss. My bad. Thanks @dpa685
$cifr A $5 non expiring warrant on 4.577 GW
$cifr closed down more than 15% at $20.38, and the casual observer assumes the worst because let's be honest; the price action sucked today.
Most likely, the fall came from a combination of fast money exiting that moved the share price to over $25 in anticipation of a new deal along with fearful investors trimming after @ERCOT_ISO delayed the release of Batch Zero at the request of Governor @GregAbbott_TX
Days like these are when you can quickly identify the bandwagon, fair weather, and real shareholders of a company. I consider myself a real shareholder and will show you why.
Right now, the value of Barber Lake, Black Pearl and Stingray is $15.71 per share. Check out the Napkin Math Model to better understand my assumptions.
Where does that leave us? Roughly $5 per share premium on the contracted leases with 4.577 GW left to monetize and no mention of Behind the Meter capacity.
Investors may get cold feet as @ERCOT_ISO delays new grid connections, and that's understandable in the interim but that ignores the 2027 potential of Odessa, Ulysses, and Reveille. Those 477 MW leased out are worth $12.77 in my analysis.
So 1.117 GW leased has a value of $27.40 with 4.1 GW left. Of that 4.1 GW, 2.9 GW will likely be approved for Batch Zero.
Do you really think Texas is going to pull the plug on its most promising industry? What's more likely is a small delay so @GregAbbott_TX can let his constituents feel like they are heard.
Additionally, this likely end up more bullish for $cifr long term as the fake DC developers clogging the grid approval que are quickly getting hit with reality when deposits get requested. Apollo will not be the last Texas site acquired that qualifies for Batch Zero. More speculators will call Tyler and ask to get bought out.
I remember last year buying $cifr below $5 because Barber Lake did not get announced. Many of us took a leap of faith on $cifr before signing its first hyperscaler. That leap of faith characterized real risk taking.
Today @fluidstack@Google@awscloud now call $cifr a trusted partner and the capital markets reward the company with some of the cheapest debt in the marketplace.
So in summary, you get $15 of value today that will likely be worth $27 of contracted leases by next year for $20 today. That's your margin of safefy.
The upside is 4.1 GW of power and BTM capacity. @BitfuryGeorge will tell you over $100, and it's hard to argue.
Now is not the time to fear. @rftylerpage and team will deliver. Are you a real shareholder?
@TheLastRefuge2 what’s too funny is you blocked my political account for posting these very words in your comments
your ego just wouldn’t let you believe there was an overarching plan to trust
you preferred to be a mouse stealing cheese out of the traps and calling that a win
@OakenshieldVGX hello i’m here to see the trading manager for cifr
yes can you provide me your quantitative trading data for cifr 4Q?
my atty needs the info for our upcoming meeting with various gubmit agencies
Cipher Mining is dead. Cipher Digital was born this morning. (I'm long CIFR)
Tyler Page just did something most CEOs never do: he burned the retreat option. Renamed the company, killed all BTC mining CapEx, and is liquidating remaining BTC by year-end.
Why does this matter?
The $2B bond tells the story. 6.125%, down 100bps from 7.125% six months ago. $13B in orders for a $2B raise. 6.5x oversubscribed. Bonds trading above par.
That's not equity speculators betting on BTC. That's fixed income investors underwriting an AI infrastructure company. Different buyer, different conviction, different time horizon.
$9.3B contracted. Barber Lake on schedule. Black Pearl mining decommissioned THIS WEEK, 85% of infrastructure reused for AWS.
IREN had its MSFT moment. HUT had its Google backstop. CIFR's moment is today, and the credit flywheel is something neither of the other two have shown. Every basis point cheaper makes the next project more profitable, which makes the next bond cheaper.
The stock is up 12% because the market just realized this isn't a miner anymore. The bond market figured it out first.
Beggin' your pardon, Proprietor Page, but the word 'round the boomtown is that the city-slicker Muckrakers are tryin' to choke your line.
They're claimin' the electrical juice in the Permian is too thin for a gusher of your size, and they're fixin' to drop a 'Batch Study' cap on your rig 'til the year of our Lord 2027.
Tell me true, sir: Do you have enough 'CIFR men' on the payroll to keep those Panic-mongers from siphonin' your lightning, or are you fixin' to just sink a pipe behind-the-meter and drink the whole state's megawatt milkshake before they can even find their straws?
Cipher is pleased to welcome industry veterans @lee_bratcher and @_drewarmstrong_ to the team.
*Lee Bratcher joins as Head of Policy & Government Affairs
*Drew Armstrong joins as Head of Strategic Initiatives
“As Cipher continues to grow into one of the world’s largest data center developers, adding experienced leaders of the caliber of Lee and Drew is critical,” said Tyler Page, Chief Executive Officer. “Their combined regulatory, strategic, and industry experience will help accelerate our growth as we continue on our path to becoming the leading innovator in the AI and HPC data center industry.”
Press Release: https://t.co/TNF9r2qycE
$CIFR's New Gigawatt Site Colchis
Recently we have seen two sites added to Cipher's pipeline, one in Ohio called "Ulysses" and one in West Texas called "Colchis".
Since a gigawatt site is rare in itself especially one coming online before 2030, I decided to take a dive into Cipher's new site gigawatt site called Colchis.
First off adding sites of this size or any size of that matter is not exactly easy by any means and shouldn't be taken lightly. Its not like going on Zillow and shopping for new acres of land with power agreements. If it was that easy then everyone would do it. This is a talent that take years of experience to achieve. $CIFR's origination team is proving the thesis in real-time.
The reality is that power for AI/HPC is very short in supply and any power coming online in the next few years is high in demand. Player's like $CIFR pose a strong stance to capture allot of demand from the AI/HPC market with their 3.4GW Pipeline.
As the intricacies of how getting power works is not common knowledge, Colchis is a well suitable example for the ERCOT market.
According to SEC Filings and $CIFR Investor Presentations, Colchis site sits on 620-acres of land under option and sit adjacent to the existing substation, and the site has all the necessary characteristics for development of an HPC data center.
Having a existing subsation sit adjacent to site is extremely valuable and eases the path to get energized.
Getting a new substation built and connected to the grid can take 3-7 years.
This saves $CIFR years of work for utility planning, permitting, and construction. This is what essentialy allows them to target a earlier energization date currently 2028 for Colchis.
How this site was acquired, was through $CIFR's origination team, the initial owners of the site essentialy couldnt afford or know how to build a Datacenter. $CIFR's expertise and vast amounts of capital allowed them to acquire 95% of the site in a join Venture.
We are not sure what the owner's got in return but my guess since nothing was said the owners got 5% equity in the to-be built Datacenter for free and $CIFR got 95% in return to fund the build of the datacenter.
According to investors presentation $CIFR's Colchis Site sits near diverse fiber paths and is also near Black Pearl and Barber Lake which were just leased for 300MW each. So we know that getting connected to major interconnection hubs like Dallas and houston will not be a issue.
$CIFR's Colchis site includes a fully executed 1-GW Direct Connect Agreement with American Electric Power (“AEP”), under which AEP will construct the necessary dual interconnection facility for a targeted energization in 2028. Construction of the interconnection facility will proceed in parallel with ERCOT's final review and approval.
The AEP Direct Connect Agreement for $CIFR is very valuable because what this means is that AEP has performed the grid and substation "stress test". They check if existing lines will melt (thermal limits), if voltage will sag, and if the grid will remain stable if a nearby power plant suddenly trips offline. The fact that the agreement is fully executed means the "System Impact Study" is done. AEP has determined that they can technically serve the load.
What this means for $CIFR's Colchis in the ERCOT queue to energization is that Colchis likely sits in the front-runner group (often called "Batch 0"), meaning they aren't waiting behind thousands of other speculative data centers. And if AEP has deemed that Colchis passed its stress test then ERCOT will likely deem the same thing.
According to SEC Filings AEP will also construct the necessary dual interconnection facility for a targeted energization in 2028. Dual-interconnection's are very valuable for large Gigawatt's site because they provide redudancy, allowing $CIFR to provide 99,99% uptime at Colchis.
https://t.co/8Tpw3ckFOt
So we know that Colchis will be adjacent to a existing substation making the connection to the transmission-level grid secured and time saving. We know that they have a AEP direct connect agreement which basically validate the likelyness of passsing ERCOT's grid stress test for energization. And we know they have a dual-interconnection lines providing 99.99% uptime and Enterprise-grade redudancy.
All this allows $CIFR the ability to bring Colchis with speed to market. Cutting through years of hassles and backlog. With a lease signed in advance this would allow $CIFR to start commencing the build of the Datacenter. A gigawatt datacenter in size will take 12 months + to build so by 2028 energization they may have a fully ready Turn-key Datacenter built to suite for the Tenant.
*On a other note for comparison $IREN bulls will likely compare this to Childress and Sweetwater which are similar and size and were early to the Queue. Not only that but they were early to securing procurement to build their own substations in house. Energization is of course 2025, 2026 and 2027 which make it earlier but from a business perspective when it comes to serving cloud and owning the GPU's you need to be energized now. Unlike $CIFR who is doing colocation they just need power coming online in the near future to start securing contracts and building Datacenters now.
@CipherInc is pleased to announce the acquisition of a 200 MW site in Ohio. The site, named Ulysses, is Cipher’s first outside of Texas.
*195 acres with secured interconnection approvals to participate in the PJM market
*Expected to energize in Q4 2027
*Well-suited for HPC given its acreage, energization timeline, availability of diverse fiber paths, and proximity to a major metropolitan area
With this addition, $CIFR's development pipeline totals ~3.4 GW across 8 sites.
Full release: https://t.co/2xmcHSVI7S
@rftylerpage “the market” is a scam
cifr team could deliver a golden goose and
jane street would kill it
come to think of it cifr has delivered a golden goose
@rftylerpage
$ORCL $OWL
THE ORACLE BLUE OWL SITUATION:
One reason we could be seeing pain across the entire market today is because Blue Owl, a private credit lender, has been financing a TON of these new datacenter deals, including many from $META.
Today, they came out and said they would not be taking on one of Oracle’s $10B datacenter deals.
Now, Oracle came out and said they chose to go with someone different (Blackstone stepped in) but the market is perceiving Blue Owl’s hesitancy here as a sign of concern over Oracle’s debt.
What’s the issue? Well, Oracle has $127B in debt.
$25B of that debt is due within three years.
Oracle has generated around $13B in cash flow over the last year, which is great, but with all the debt…they aren’t expected to get back to positive FCF until 2028.
This is why their credit default swaps are up 200% in the past few months, bond market is hedging aggressively on if Oracle can’t pay back the debt.
The only way for them to pay it back? That $500B of RPO…has to be real. If they can’t generate that revenue, they won’t have the cash flow to show they can pay back the debt.
As a result, any datacenter play now falls within the same bucket: the market thinks they are all over leveraged, can’t pay back the debt, may not get an ROI on their capex, don’t deserve a premium. These fears may be misplaced, but this seems to be driving the AI selloff today.
Structural concrete and steel erection are underway at Barber Lake, just 8 weeks after lease execution. Another example of $CIFR's best-in-class team delivering quality execution at scale, with speed.