Top Tweets for #PhilRoberts
@philroberts I have one more, and it’s much more hypothetical, but… I shared my thinking on FPUSA offering accelerated timelines/manufacturing buildouts and asked for an illustration

@philroberts I seriously doubt either actually hit COD by end of 2026, but that was the Bimergen stated timeline.
Basically that says to me the projects will take delivery of the cubes as fast as $eose can make them!
"when do those orders need to hit site"
Redbird was supposed to break ground in Q2 per Bimergen with an end of 2026 COD.
That sounds like Q3 production to me. 400 MWh. About ~$100mm.
Surely Q3 had existing Q3 customers, so Mahaz is behind the customer desired schedule this quarter in my mind.
And Wildfire had the same basic timeline per Bimergen, so immediately after the last Redbird cube ships, the first Wildfire cube should ship.
Where's the felt!
@FreemyerGreg @eosesetu98 @philroberts said maybe two years ago that 4GWh should be doable. Did you have similar thoughts on this?
@philroberts @avandyc @transportgovuk @tesla_uk I'll be honest, Phil, I found his interactions with me quite odd. He seems to deny that FSD exists and has a "no, no, no, no" attitude when reality is pointed out. But what's even more odd is that he's seemingly an EV owner or at least pro-EV.
@philroberts @transportgovuk @tesla_uk Yeah, I agree. It should only be an option once it’s available. You've always been able to purchase FSD outright for £6800, but they've removed that option and it's now only available via subscription. But the bottom line is still the same - you can't use it in the UK 😪
@philroberts @transportgovuk @tesla_uk Oh, it’s not available in the UK yet. The subscription only gives us EAP, not FSD. Completely different.
@philroberts Looks great, but you're going to need taller stacks!
@FreemyerGreg @philroberts @bert_gilfoyle Z3 definitely a better fit but that market will be open to LFP.
Question for @philroberts or @bert_gilfoyle (or anyone else with detailed engineering knowledge).
The $EOSE Z3 is known as a 4hr plus duration battery.
But, when it comes to an AI data center requirement for 5 or even 10 charge-discharge reversals in an hour it seems the Z3 is a better fit than a Li-ion cube.
What is the chemistry / heat discharge characteristic of the systems that makes that true?
I know about the 5msec response time, but super-capacitors are used in the real world to address those sub-second bursts.
Thoughts on Form’s Multi-GWh Deals
The recent multi-GWh announcements from Form Energy have understandably caught the attention of EOS investors. At face value, they can be interpreted as large-scale commercial validation in direct competition with EOS. But before drawing conclusions about competitive positioning, it’s important to be precise about what is actually being purchased - and why.
The Google and Crusoe deployments are tied to the portion of data center infrastructure where the core requirement is uninterrupted power under all conditions. These procurements are for power reliability, not daily storage. That is a fundamentally different problem than energy arbitrage or daily load shifting.
Data centers are engineered around redundancy - N+1, 2N - and today that redundancy is provided by diesel generators capable of running for extended periods. When a buyer procures multi-GWh of storage on-site, they are solving for duration and certainty of supply, not cycle frequency or efficiency.
Form’s iron-air system is built for ~100-hour discharge with relatively low efficiency - roughly 50% RTE. That combination is not competitive in high-cycle applications. It only works economically when the system is used infrequently and where the value of stored energy - measured in total hours of coverage - outweighs the cost of the inefficiency. In other words, Form is structurally aligned with multi-day backup and resilience. The technology choice itself points to how the asset is expected to be used.
These multi-GWh deployments can be misleading if interpreted as throughput capacity. In the context of the Google and Crusoe deals, they are better understood as “fuel tank equivalents” - large reservoirs of stored energy intended to cover extended outages. A daily-cycling system optimized for peak shifting or renewable firming does not require that level of energy capacity per site. The sizing reflects coverage duration, not operational intensity.
Importantly, this does not mean data centers are a “Form-only” use case. Data centers have two distinct power needs: daily load management and long-duration resilience. Form is being deployed to address the latter. EOS is positioned for the former - where systems cycle regularly to manage load, reduce peak demand, and support constrained grid connections. These are adjacent layers of the storage stack with different economic drivers: one optimized for utilization and efficiency, the other for duration and certainty of supply. In practice, they can coexist within the same site, serving different roles in the overall power architecture.
The important takeaway from these deals in my view is this: Form is not displacing EOS from the LDES stack, or even displacing lithium-ion based storage. It reflects a shift in how large power consumers are choosing to meet multi-day resilience requirements - moving from fuel-based backup toward dedicated storage infrastructure. That is a distinct demand signal. It expands the storage stack rather than collapsing it into a single winning technology.
EOS will not be judged on multi-day backup projects. Those procurements are solving a different problem. EOS is competing in the daily-cycling segment of the market.
Bottom line: Form’s multi-GWh deals are significant (and good news for clean energy), but they are solving a different problem. They resemble a replacement for fuel-based backup more than a substitute for daily-cycling storage. EOS investors should view this as the emergence of a complementary layer in the storage ecosystem - not a direct read-through on EOS’s competitive position.
Let the experts weigh in. @philroberts @bert_gilfoyle @DesignClimate
@philroberts @trevcare True for the 19 bipolar dividers that are the core of the battery.
Not true for the collector plates that go into slots 1 and 21.
Joe even posted a video of the titanium collector plates being manufactured.
@trevcare @philroberts What are you confused about?
That part of the picture is almost identical to Line 1.
@bReynirk @philroberts @CompoundingTony Still says it is in the queue here:
https://t.co/t0aKr31Q8o
Grok tells me that is a timely source.
Grok further says the ERCOT report coming out this Friday captures mid-February status, so that monthly report won't show it for another month even if it went live last week.
@FreemyerGreg @philroberts @CompoundingTony Agree they don’t own the data. And a good headline figure would encourage me. The headline figure Joe threw out of 300MWh did the opposite. And I personally doubt Torrecillas went live and the company didn’t say anything about the commissioning being completed.
@philroberts @bReynirk @CompoundingTony Projects like Torrecillas connect to the public grid, so some of the data can be gleaned from the interconnect side.
Being merged into a wind farm may make that harder to interpret.
Hopefully Torrecillas went live in the last few days as planned?
@bReynirk @CompoundingTony @philroberts Joe very explicitly said they expected Q1 commissioning revenue.
Real world cycling is upon us.
@CompoundingTony @philroberts @FreemyerGreg We also can’t show Z3s cycling reliably in the field. Anywhere.
@philroberts @dcshi13 @CompoundingTony I'm happy to find out 2 years from now. No rush. Let the customers decide.
@dcshi13 @philroberts @CompoundingTony Lots of cube customers for Line 1.
Maybe in a couple years that will change.
As Phil highlighted, these are permitted projects he is discussing. Changing from Cubes to Cores would require huge paperwork and delay.
@philroberts @CompoundingTony This discussion is why I hope $eose currently pushing the line as hard as it productively can. Even if it doesn't have Q1 customers.
@philroberts @FreemyerGreg I understand. But so far we can’t show we can produce it reliably. That’s not about line 2. That’s about line 1 and Eos in general.
@philroberts @FreemyerGreg Don’t you think Eos needs to prove to customers that they can reliably produce that by having line 1 stable for at least 1 or 2 quarters?
If I was a potential customer with a 2GWh project I would like to know that it doesn’t take 2 years to produce it.
@Bullstkpicks @philroberts @FreemyerGreg At this point I would be ecstatic to have 4 lines by end of 2027. Terminal velocity (TAM) hasn't changed, but we do appear to be 6+ months behind where I thought we were in terms of ramping. Classic.
I want them to get manufacturing RIGHT, but also a lot faster than we are.
@philroberts @FreemyerGreg Yes over a few year period makes sense. To get to large PT we really need to get to 8-12 lines and be able to produce 24-30 GWh annually
Jabi Lake to Become Nigeria’s Flagship Marine Tourism Hub as Phil Roberts, Ned Nwoko Lead Climate Tourism Drive
By George Dotimi(BOSTON ONLINE MEDIA)
https://t.co/f0pNrDeTJu…
#bostononlinemedia
#PhilRoberts
#GlobalInvestors
#PublicPrivatePartnership
#NigeriaRising

Jabi Lake to Become Nigeria’s Flagship Marine Tourism Hub as Phil Roberts, Ned Nwoko Lead Climate Tourism Drive
By George Dotimi(BOSTON ONLINE MEDIA)
https://t.co/f0pNrDeTJu…
#bostononlinemedia
#PhilRoberts
#GlobalInvestors
#PublicPrivatePartnership
#NigeriaRising

Jabi Lake to Become Nigeria’s Flagship Marine Tourism Hub as Phil Roberts, Ned Nwoko Lead Climate Tourism Drive
By George Dotimi(BOSTON ONLINE MEDIA)
https://t.co/f0pNrDeTJu…
#bostononlinemedia
#PhilRoberts
#GlobalInvestors
#PublicPrivatePartnership
#NigeriaRising

Trends for you
Most Popular Users

Elon Musk 
@elonmusk
239.6M followers

Barack Obama 
@barackobama
118.6M followers

Cristiano Ronaldo 
@cristiano
114.3M followers

Donald J. Trump 
@realdonaldtrump
111.7M followers

Narendra Modi 
@narendramodi
106.9M followers

Rihanna 
@rihanna
98.6M followers

NASA 
@nasa
92.1M followers

Justin Bieber 
@justinbieber
91.7M followers

KATY PERRY 
@katyperry
89.9M followers

Taylor Swift 
@taylorswift13
83.9M followers

Lady Gaga 
@ladygaga
75.4M followers

Virat Kohli 
@imvkohli
73.3M followers

Kim Kardashian 
@kimkardashian
70.8M followers

YouTube 
@youtube
68.6M followers

Neymar Jr 
@neymarjr
66.3M followers

Bill Gates 
@billgates
65.1M followers

Selena Gomez 
@selenagomez
63M followers

The Ellen Show
@theellenshow
62.1M followers

CNN 
@cnn
61.7M followers

X 
@x
60.6M followers













