Just opp Ghatkopar depot Casurina bus stop ( west bound) big pothole biker can fall bust stop passengers get flash of water. Kindly fill immidiately @mybmcWardN@mybmc@myBESTBus@mybmcSWM
Bus no A 490. There are only 2 buses in the morning from Thane.
When it reaches CST/GPO or Golden gate which is mentioned in Chalo app driver refused to open door saying there is no bus stop or stops not mentioning this route number Kindly look into it @myBESTBus
All BEST buses going below the flyover from Mumbai Whn 100 mtr away it takes 5 signal to cross junction, 20 mins it takes. 50 passenger's in bus suffer during pk hr this is injustice for traveling in public transport. Pl look in to it @MTPHereToHelp Thane Teen hathnaka junction
Anil Ubhare Marg Ghatkopar E, road opened after many months, BMC contractor started parking on both sides,no footpath,at night place is dark, safety issue, speedy vehicles,difficult to walk,Kindly look into issue in public interest @mybmcWardN@mybmcSWM@TawdeRitu@MumbaiPolice
Newly inaugurated / opened Laxminagar bridge Ghatkopar. Access from Laxminagar end approach is blocked by Vehicles parked by Garage kindly clear the block BEST busses find difficult to go over bridge @mybmc@MumbaiPolice
Laxminagar Ghatkopar East new Bridge above nulla, West to East side was recently opened for vehicles. BEST should take note of it and start original routes via that bridge like 489 , 27, 499,494 , 370 etc @myBESTBus@mybmcWardN@ParagShahBJP@TawdeRitu
I saw Video on future Mumbai going to change fast by our CM but we are interested in Ghatkopar Laxminagar Bridge over nulla, is under construction last 6 years,when it will be completed. Also metro and other flyover in those spots going slow.
@Dev_Fadnavis@Maharail_Corp
Sion subway Below gate no 7 (gate is closed ) but entry from other side There is stagnant dirty water since many days. No one cleans.
Kindly look in to it
@mybmcSWM@mybmc@mybmcWardFN
@myBESTBus
For Bus no A 490 - Chalo App showing bus stop at DrShamprasad Mukherji chowk but bus driver says there is no stop mentioned for A490 kindly look into it Same for CST/GPO
When Nulla is clean & during high tide water smoothly flows, it looks like a river this pic looks scenic , is of nulls taken from Anil ubhare marg south end near udyan society, good work at this end by BMC @mybmcWardN@mybmcSWM@AshwiniBhide
Anil Ubhare marg ghatkopar east condition of road (video) Road is brown full of mud etc.BMC vehicle depot situated there, link road to BMC bldg road is clean, not till Udyan society, automatic cleaning machine parked in BMC depot they can clean once a week @mybmcWardN@mybmcSWM
Request RERA type body to monitor infra project by BMC/or Maha Govt for timely completion
They should start project only after full land acquisition, half held project contractor get dues for that work, public not benefited traffic jam at sites etc. @AshwiniBhide@Dev_Fadnavis
I was passing through Kalamboli highway Junction from Mumbai side (near circle) road is horrible with uneven surfaces. Anytime 2 wheelers accidents can happen kindly resurface immediately hardly 2-3 meter area @PanvelCorp@Maharashtr58413@nitin_gadkari