George Soros taught us reflexivity.
Prices don't just reflect reality.
They CREATE reality.
When oil went NEGATIVE in April 2020 — minus $37 a barrel — it wasn't just a price.
It was a generational signal.
The most extreme sentiment extreme in commodity history.
Producers paying YOU to take their oil.
That was the low of oil in our lifetime.
Reflexivity works both ways:
↓ Prices so low they destroy future supply
↓ Underinvestment kills exploration
↓ Weak hands wiped out
↓ Only the strongest survive
Then the cycle turns.
Now look at this Energy vs Tech chart.
The ratio just bounced off the SAME lows as September 2000.
Last time:
→ Energy ran 500%+
→ Tech went nowhere for a decade
The multi-decade energy breakout has begun.
Soros would recognise this setup immediately.
$XLE $XOM $CVX $OXY
Hay mútiples informes que dicen que va a dispararse aún más el recibo de la luz para los ciudadanos.
Si España alcanza 6 GW de nuevos centros de datos sin regulación, las emisiones del sector eléctrico podrían aumentar un 81% y el precio mayorista un 14%.
Radiant is creating two factories that will fabricate their 1 MW truck-transportable Kaleidos nuclear microreactors. Article link in reply.
They're targeting initial customer deliveries in 2028. In the longer term, they're planning to have capacity reaching hundreds of units annually.
☢️ GTA VI has a nuclear plant!
Its modeled after Turkey Point Nuclear Generating Station, which began operation in 1972.
The plant is designed to withstand winds over 300mph, and its cooling channel is big spawn point for American Crocodiles.
The site is licensed to add two more Westinghouse AP1000 reactors. Let's get those built!
Development of the option to use nuclear for ship propulsion and offshore power plants is moving steadily forward. Major maritime institutions like Lloyd's are giving it serious attention. Article link in reply.
Most flexible data center studies report annual curtailment. At 75 GW of new load, EPRI analysis finds that number is under 0.3%. Nearly every region still needs to curtail 100% of the load in at least one hour. The median is not the message.
Tyler Bernstein, CEO of Zeno Power, explains:
“over the past few decades we've on average built one of these systems per decade at a price of 250 million dollars per unit to power our multi-billion dollar probes that are going to Mars”
@tybernstein@zeno_power
Convinced #nuclear here is a waste of time, money and water? 8 of the 10 countries with the most firm, low-emission electricity heard the same argument. Then built anyway. I keep asking: check the chart again.
"I did join the ANS in 1974," recalled venture capitalist and philanthropist @rayrothrock and Co-Chair of the 2026 ANS Winter Conference. "[I]n those days, it feels about like it is today: it’s a very exciting time. I got my Atomic Energy Merit Badge in 1969, which motivated me down this path that I’m in ��� that I continue on today. The last 15 years have been amazing."
https://t.co/6dE4ruVdzM
It's a pricing problem, not sabotage. When summer-winter spreads can't cover storage costs, capacity closes. Rough, now Atwick. Have you tried ensuring winter gas security with 10% less storage? #gasstorage
@David_Moody99@KathrynPorter26 Atwick is ~10% of UK storage gone, Rough before it. The spreads no longer pay to keep the caverns full, and the plan is still just in time LNG. What could go wrong?
@KathrynPorter26 10.9 bcf of fast-cycle storage closing in 2027. 'Market arrangements no longer support the facility' is a polite way of saying the market doesn't value reliability. You get the winter you plan for. #gasstorage
@Canadians4CANDU@cme_mec I keep saying nuclear is clean power and industrial strategy at once. $4.9B GDP and 36,700 job-years per exported reactor. What part of that do critics still not get? #nuclear
@Climatehope2@Climatehope2 The data says otherwise. Barakah #nuclear : 4 reactors, ~5.6 GW, built in under a decade, now ~25% of UAE electricity. Clean 24/7 power at scale. 'Too slow' describes slow jurisdictions, not the technology.
@NuScale_Power@everstarai Licensing is where SMR schedules go to die. Automating the document burden so engineers can focus on engineering is exactly the right move. #nuclear